ActivăTED — Licitații europene45260000 — Lucrari de acoperire si alte lucrari speciale de constructii·590167-2026
Irlanda – Lucrări de acoperire şi alte lucrări speciale de construcţii – Asbestos Roof Removal, Roof Replacement, Solar PV, Battery Storage and Smart Energy Control System at Athy Rugby Club
Anunțul 590167-2026 pentru Irlanda – Lucrări de acoperire şi alte lucrări speciale de construcţii – Asbestos Roof Removal, Roof Replacement, Solar PV, Battery Storage and Smart Energy Control System at Athy Rugby Club este publicat de Athy Rugby Football Club și este încadrat la codul CPV 45260000.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
Asbestos Roof Removal, Roof Replacement, Solar PV, Battery Storage and Smart Energy Control System at Athy Rugby Club
Athy Rugby Club wishes to appoint a suitably qualified Design and Build Contractor for the removal and lawful disposal of asbestos roof materials, replacement of the clubhouse roof with a new insulated composite roof system, and the design, supply, installation, commissioning and support of a Solar PV Array, Battery Energy Storage System (BESS) and Smart Energy Control System. The works include the removal and disposal of approximately 830 m2 of asbestos-containing roof coverings and associated asbestos gutters and downpipes. A new insulated roof system with a minimum 50-year design life and new gutters and downpipes shall be installed. Tenderers shall attend a mandatory pre-tender site inspection and measurement survey. All dimensions and quantities are indicative only and tenderers shall rely on their own measurements. No adjustment to the Contract Sum will be permitted for quantity or measurement differences that could reasonably have been identified before tender submission. The successful contractor shall be responsible for all asbestos-related compliance, removal, transportation, disposal documentation and certification. The Smart Energy Control System shall optimise energy generation, storage and consumption, integrate with the existing generator, manage battery charging and discharge, support floodlighting loads and include a secure web-based monitoring platform and smart phone application. The project is part-funded through the LEADER Programme.
Athy Rugby Football Club
European Dynamics S.A.
https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8902424
The High Court of Ireland
01
EL301
[telefon eliminat]:00:00+01:00
Dublin
none
2026-09-08+01:00
required
www.athyrugbyclub.com
09332[telefon eliminat]
ORG-0003
cn-standard
ORG-0001
ORG-0002
EUR
16
https://www.etenders.gov.ie/epps/cft/listContractDocuments.do?resourceId=8902424
45310000
[email eliminat]
Athens
32014L0024
0
Athy Co. Kildare
3
17:00:00+01:00
[telefon eliminat]
true
GRC
59a8318a-269d-4aa6-880e-301e7cdccaf4
2026-08-26+02:00
Athy
31230000
non-restricted-document
ENG
45261213
no
IRL
body-pl
works
eforms-sdk-1.13
AG1
45260000
not-allowed
Four Courts, Inns Quay, Dublin 7
[email eliminat]
2026-08-24+01:00
45261410
09330000
Athy Co Kildare
[telefon eliminat]
LOT-[telefon eliminat]
R14 XV27
7222[telefon eliminat]
epo-procurement-document
eu-funds
rcr
D07 WDX8
90650000
false
[email eliminat]
180
IE061
[telefon eliminat]/2026
16:59:49+01:00
IE062
https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=8902424
2026-09-16+01:00
The Showgrounds, Dublin Road, Athy, Co Kildare
2.3
None
ted-esen
72e1fb95-b43b-47c8-94b0-9f0ee588843b
open
Loturi TED
1
0
Asbestos Roof Removal, Roof Replacement, Solar PV, Battery Storage and Smart Energy Control System at Athy Rugby Club
275.000,00 EUR
până la 16 sept. 2026, 18:00
Athy Rugby Club wishes to appoint a suitably qualified Design and Build Contractor for the removal and lawful disposal of asbestos roof materials, replacement of the clubhouse roof with a new insulated composite roof system, and the design, supply, installation, commissioning and support of a Solar PV Array, Battery Energy Storage System (BESS) and Smart Energy Control System. The works include the removal and disposal of approximately 830 m2 of asbestos-containing roof coverings and associated asbestos gutters and downpipes. A new insulated roof system with a minimum 50-year design life and new gutters and downpipes shall be installed. Tenderers shall attend a mandatory pre-tender site inspection and measurement survey. All dimensions and quantities are indicative only and tenderers shall rely on their own measurements. No adjustment to the Contract Sum will be permitted for quantity or measurement differences that could reasonably have been identified before tender submission. The successful contractor shall be responsible for all asbestos-related compliance, removal, transportation, disposal documentation and certification. The Smart Energy Control System shall optimise energy generation, storage and consumption, integrate with the existing generator, manage battery charging and discharge, support floodlighting loads and include a secure web-based monitoring platform and smart phone application. The project is part-funded through the LEADER Programme.
45260000 — Lucrari de acoperire si alte lucrari speciale de constructii
Durată: 3 MONTH
Detalii licitație
Descriere
Athy Rugby Club wishes to appoint a suitably qualified Design and Build Contractor for the removal and lawful disposal of asbestos roof materials, replacement of the clubhouse roof with a new insulated composite roof system, and the design, supply, installation, commissioning and support of a Solar PV Array, Battery Energy Storage System (BESS) and Smart Energy Control System. The works include the removal and disposal of approximately 830 m2 of asbestos-containing roof coverings and associated asbestos gutters and downpipes. A new insulated roof system with a minimum 50-year design life and new gutters and downpipes shall be installed. Tenderers shall attend a mandatory pre-tender site inspection and measurement survey. All dimensions and quantities are indicative only and tenderers shall rely on their own measurements. No adjustment to the Contract Sum will be permitted for quantity or measurement differences that could reasonably have been identified before tender submission. The successful contractor shall be responsible for all asbestos-related compliance, removal, transportation, disposal documentation and certification. The Smart Energy Control System shall optimise energy generation, storage and consumption, integrate with the existing generator, manage battery charging and discharge, support floodlighting loads and include a secure web-based monitoring platform and smart phone application. The project is part-funded through the LEADER Programme.
Căutări relevante pentru 590167-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.