Anunțul 597497-2026 pentru Muntenegru – Lucrări de construcţii de staţii de tratare a apelor reziduale – Construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority measures in the Municipality of Kolašin este publicat de Municipality of Kolašin și este încadrat la codul CPV 45252127.
Harvey procesează documentele acestei licitații...
The indicative scope of works covers the following elements: 1. Sewerage network: Construction of sewerage network in the approximate length of 9.2 km which will serve to 3000 inhabitants in the following settlements: Kolašin city centre, Braće Vujisić (Dulovina), Breza and partly Smailagića Polje and Gornji Pažanj. 2. Water supply priority measures: Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. - Preparatory services (operational GIS, HID based hydraulic model, leakage detection for 30 km of network and detailed design of new elements including SCADA) - Supply, installation and commissioning of bulk flowmeters, and water meters (400), establishment of DMAs and SCADA - Works for upgrade of the water distribution system hydraulic configuration. 3. Wastewater Treatment Plant Design and Construction of WWTP in Bakovići settlement - Conventional Activated Sludge Process and aerobic sludge stabilization. Design and construction of the WWTP shall include two phases: Phase I - 4000 PE (to be constructed): Wastewater flowrate (including infiltration) = 765 m³/d (9 l/s); Peak dry weather flow = 57 m³/h (16 l/s); Peak wet weather flow to =109 m³/h. Phase II - additional 2000 PE (to be considered in design): Wastewater flowrate (including infiltration= 1045 m³/d (12 l/s); Peak dry weather flow = 77 m³/h (21 l/s); Peak wet weather flow = 150 m³/h The proposed process for WWTP includes: Influent pipe and by-pass line, inlet chamber, Coarse screens, Fine screens, Aerated grit chamber, Distribution chamber, Primary sedimentation, activated sludge and secondary sedimentation (biological) treatment, Effluent control and measurement chamber, Discharge line to the Tara River, Sludge pumping station, Sludge distribution chamber, Sludge thickener, Sludge reed beds, Drainage pumping station, Building for guard, laboratory, blowers, warehouse, Odour control, Plant infrastructure, fences, access and internal roads with greenery, Utility connections: Pressure effluent line (DN280, 1870 m); Access road (2100 m); Power supply; Water supply (DN100, 1195 m); Telecom. Total expected duration of the contract is 48 months, including 12 months of Defects Notification Period. The Municipality of Kolašin intends to conduct open international procedure for selection of contractor. The selection procedure will be conducted through the procedure as specified in the practical guide for European Union external action (PRAG) and EIB Guide to Procurement (2024). In case of any conflict the EIB Guide to Procurement https://www.eib.org/en/publications/20240132-guide-to-procurement-for-projects-financed-by-the-eib will apply.
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
Cod CPV
45252127 — Lucrari de constructii de statii de tratare a apelor reziduale
Vezi alte licitații publice pentru CPV 45252127 — Lucrari de constructii de statii de tratare a apelor reziduale pornind de la 597497-2026.
Autoritate contractantă
Municipality of Kolašin
Explorează și alte anunțuri publicate de Municipality of Kolašin.
Cuvinte-cheie din titlu
Muntenegru – Lucrări de construcţii de staţii de tratare a apelor reziduale – Construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority measures in the Municipality of Kolašin
Caută proceduri similare folosind titlul licitației 597497-2026.