Anunțul 617330-2026 pentru Danemarca – Lucrări de construcţii de staţii de purificare a apei – Technical Water Treatment Plant este publicat de DIN Forsyning Teknisk Vand A/S și este încadrat la codul CPV 45252210.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
Danemarca – Lucrări de construcţii de staţii de purificare a apei – Technical Water Treatment Plant
NOTICE type
can-standard
NOTICE version
1
Procedure accelerated
false
Procedure features
The procurement procedure was conducted as a competitive procedure in accordance with the Danish Public Procurement Act (ACT No. 10 of 06 January 2023), section 61-66. The procurement procedure was divided into two phases; (i)a request for participation phase and (ii)a tendering phase, possibly including one or more round(s) of negotiations. DIN Forsyning Teknisk Vand A/S may award the contract based on the initial, revised or final tender. Accordingly, the tenderers cannot expect that negotiations will be conducted. Negotiations can be carried out in a number of successive stages in order to limit the number of tenders which require negotiation. DIN Forsyning Teknisk Vand A/S reserves the right to cancel/change negotiation meetings, request extra negotiation meetings, conduct written/oral negotiations and/or speed up/postpone the submission of revised/final tenders.
Procedure identifier
a1505039-2902-44cb-b360-b3949a80a94e
Procedure type
neg-w-call
Autoritate contractantă16
Authority main activity
gen-pub
Buyer city
Esbjerg N
Buyer contact point
Lars Skov Bjerrum
Buyer country
DNK
Buyer country sub
DK032
Buyer email
[email eliminat]
Buyer identifier
43898388
Buyer internet address
https://dinforsyning.dk/
Buyer legal type
body-pl
Buyer name
DIN Forsyning Teknisk Vand A/S
Rezultate, atribuiri și contracte10
Award criterion description LOT
Total price incl. options (CAPEX) (25%) When evaluating the total price incl. options (CAPEX), emphasis is placed on the following: - The total price incl. options (CAPEX). Emphasis is placed on prices being as low as possible. Total operating costs (OPEX) (15%) When evaluating the total operating costs (OPEX), emphasis is places on the following: - The total operating costs incl. service agreement (OPEX). Emphasis is placed on operating costs being as low as possible. If the tenderer's performance guarantee is conditional on DIN Forsyning Teknisk Vand A/S entering into a service agreement with the tenderer, costs for this service agreement will be added to the price (CAPEX).
The procurement of Technical Water Treatment Plant (TWTP) was initiated on the basis of an anticipated aggregate water demand associated with two large-scale Power-to-X projects in the Esbjerg area. The original design basis was founded on significantly higher capacity requirements from the expected Power-to-X projects than those currently considered realistic. The original premise/requirements was based on 2 GW capacity. This has changed to approximately 540 MW capacity. The revised capacity requirements mean that the project's underlying assumptions are no longer the same as those that existed when the procurement was initiated. The reduction affects the sizing of the facility, the technical solution, the expansion schedule, the level of investment, operational economics, the project's risk profile, the contracting strategy, the technical specifications, and the contractual framework. It is assessed that the change is so substantial that the project cannot be continued on the basis of the existing procurement documents without fundamental modifications. The current procurement documents were prepared on the basis of a different and significantly greater demand than the demand which is now considered realistic. Based on the above mentioned assessment it is considered that DIN Forsyning Teknisk Vand A/S, in its capacity as contracting authority, has objective and legitimate grounds for cancelling the procurement, as the contracting authority's requirements have changed substantially. The change is not considered capable of being accommodated within the existing procurement documents or within the rules governing amendments to contracts. Accordingly, the change must be regarded as affecting fundamental elements of the procurement, as the nature and scope of the contract would differ materially from those contemplated under the original procurement basis. Consequently, if it is decided to proceed with the project on a significantly revised scope, it is considered necessary to conduct a new procurement procedure. DIN Forsyning Teknisk Vand A/S expects that a new procurement will be published in the first half of 2027.
The procurement of Technical Water Treatment Plant (TWTP) was initiated on the basis of an anticipated aggregate water demand associated with two large-scale Power-to-X projects in the Esbjerg area. The original design basis was founded on significantly higher capacity requirements from the expected Power-to-X projects than those currently considered realistic. The original premise/requirements was based on 2 GW capacity. This has changed to approximately 540 MW capacity. The revised capacity requirements mean that the project's underlying assumptions are no longer the same as those that existed when the procurement was initiated. The reduction affects the sizing of the facility, the technical solution, the expansion schedule, the level of investment, operational economics, the project's risk profile, the contracting strategy, the technical specifications, and the contractual framework. It is assessed that the change is so substantial that the project cannot be continued on the basis of the existing procurement documents without fundamental modifications. The current procurement documents were prepared on the basis of a different and significantly greater demand than the demand which is now considered realistic. Based on the above mentioned assessment it is considered that DIN Forsyning Teknisk Vand A/S, in its capacity as contracting authority, has objective and legitimate grounds for cancelling the procurement, as the contracting authority's requirements have changed substantially. The change is not considered capable of being accommodated within the existing procurement documents or within the rules governing amendments to contracts. Accordingly, the change must be regarded as affecting fundamental elements of the procurement, as the nature and scope of the contract would differ materially from those contemplated under the original procurement basis. Consequently, if it is decided to proceed with the project on a significantly revised scope, it is considered necessary to conduct a new procurement procedure. DIN Forsyning Teknisk Vand A/S expects that a new procurement will be published in the first half of 2027.
Guidance for complaints: https://naevneneshus.dk/start din-klage/klagenaevnet-for-udbud/vejledning/ The Danish Complaints Board for Public Procurement's appeal deadlines: In the case of a tender with pre-qualification a complaint about not having been pre-qualified must be submitted within 20 calendar days. This is calculated from the day after DIN Forsyning Teknisk Vand A/S sends a notification of prequalification/selection. Other complaints about tenders or decisions, e.g. award of contracts must be submitted 45 calendar days from the day after DIN Forsyning Teknisk Vand A/S' publication of a notice on the conclusion of a contract. At the latest at the same time as a complaint is submitted to the Danish Complaints Board for Public Procurement, the complainant must notify DIN Forsyning Teknisk Vand A/S in writing that a complaint is being submitted to the Danish Complaints Board for Public Procurement and about whether the complaint has been submitted during the standstill period, cf. the Act on the Danish Complaints Board for Public Procurement section 6, subsection 4. In cases where the complaint has not been submitted during the standstill period, the complainant must also state whether a suspensive effect of the complaint is requested, cf. section 12, subsection of the Act on the Danish Complaints Board for Public Procurement. The rules on appeal deadlines are found in section 7 of the Act no. 593 of the 02/06/2016 on the Danish Complaints Board for Public Procurement.
Date de contact publicate în TED
19
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
Technical Water Treatment Plant
When evaluating organization and qualification, positive emphasis is placed on the following: The extent to which the tenderer manages to demonstrate a resilient and robust organization, which shows a clear distribution of roles, responsibilities and powers throughout the project, which supports DIN Forsyning Teknisk Vand A/S in the best way, as described in the procurement documents. It is also considered positive, if the tenderer shows an organization that also can handle operations, technological development and the capacity to be innovative. The extent to which the key employees who are part of the organizational plan have relevant education, skills/qualification and experience in relation to the role the individual employee is intended for in the organization/project and that these are being utilized in the organization. Particular attention is paid to the following key employes: o Project manager (primary contact person for the Employer) o Assistant project manager o Process engineer o Mechanical engineer o Controls engineer o Architect o Construction manager o Commissioning manager o Service manager
This contract notice apply to DIN Forsyning Teknisk Vand A/S' cancellation of the procurement of Technical Water Treatment Plant. Technical Water Treatment Plant is a facility that cleans purified wastewater for use in Power-to-X facilities. In Denmark, the declared goal by 2030 of reducing CO2 emissions by 70% to combat climate change has led to an ambitious plan for Power-to-X, i.e. converting green renewable electricity into fuels (and more) for use in the hard-to-abate sectors, such as the industry, heavy transport, aviation, and shipping transport. DIN Forsyning Teknisk Vand A/S cooperates with companies that want to buy significant quantities of technical water. Technical water is a general term for water that has a different quality than drinking water. The technical water will have a quality as demineralized water. The procurement comprised the complete delivery of a combined plant consisting of: Pure Water Treatment Plant; Reject Water Treatment Plant; buildings; and high voltage installations. The plant is called Technical Water Treatment Plant (TWTP). The TWTP will be located on Mådevej, 6700 Esbjerg. The TWTP must be designed to operate continuously, 24 hours a day, 7 days a week, and 52 weeks a year. The project will be divided in two phases; Phase 1 and Phase 2. Phase 2 is included as an option. The initial phase (Phase 1) will support approximately half of the total capacity. Project capacity: Phase 1 must have a capacity of 230 m³/h output. Phase 2 (option) must have a capacity of 230 m³/h output. The project including the optional Phase 2 must have a capacity of 460 m3/h output. This project also includes a contract for underground piping which is offered in another procurement. DIN Forsyning Teknisk Vand A/S has chosen not to divide the project/contracts further. DIN Forsyning Teknisk Vand A/S has assessed that handling interfaces, responsibilities and risks in particular the contract for TWTP is best placed with the contractor. Further division of the project /contracts will entail increased risk for DIN Forsyning Teknisk Vand A/S, as well as increased costs for construction management etc., which is why DIN Forsyning Teknisk Vand A/S has found it appropriate not to divide the project/contracts further.
Total price incl. options (CAPEX) (25%) When evaluating the total price incl. options (CAPEX), emphasis is placed on the following: - The total price incl. options (CAPEX). Emphasis is placed on prices being as low as possible. Total operating costs (OPEX) (15%) When evaluating the total operating costs (OPEX), emphasis is places on the following: - The total operating costs incl. service agreement (OPEX). Emphasis is placed on operating costs being as low as possible. If the tenderer's performance guarantee is conditional on DIN Forsyning Teknisk Vand A/S entering into a service agreement with the tenderer, costs for this service agreement will be added to the price (CAPEX).
Organization and qualification
Process and collaboration
Phase 2 (option) with a capacity of 230 m³/h output.
Guidance for complaints: https://naevneneshus.dk/start din-klage/klagenaevnet-for-udbud/vejledning/ The Danish Complaints Board for Public Procurement's appeal deadlines: In the case of a tender with pre-qualification a complaint about not having been pre-qualified must be submitted within 20 calendar days. This is calculated from the day after DIN Forsyning Teknisk Vand A/S sends a notification of prequalification/selection. Other complaints about tenders or decisions, e.g. award of contracts must be submitted 45 calendar days from the day after DIN Forsyning Teknisk Vand A/S' publication of a notice on the conclusion of a contract. At the latest at the same time as a complaint is submitted to the Danish Complaints Board for Public Procurement, the complainant must notify DIN Forsyning Teknisk Vand A/S in writing that a complaint is being submitted to the Danish Complaints Board for Public Procurement and about whether the complaint has been submitted during the standstill period, cf. the Act on the Danish Complaints Board for Public Procurement section 6, subsection 4. In cases where the complaint has not been submitted during the standstill period, the complainant must also state whether a suspensive effect of the complaint is requested, cf. section 12, subsection of the Act on the Danish Complaints Board for Public Procurement. The rules on appeal deadlines are found in section 7 of the Act no. 593 of the 02/06/2016 on the Danish Complaints Board for Public Procurement.
Price
The procurement of Technical Water Treatment Plant (TWTP) was initiated on the basis of an anticipated aggregate water demand associated with two large-scale Power-to-X projects in the Esbjerg area. The original design basis was founded on significantly higher capacity requirements from the expected Power-to-X projects than those currently considered realistic. The original premise/requirements was based on 2 GW capacity. This has changed to approximately 540 MW capacity. The revised capacity requirements mean that the project's underlying assumptions are no longer the same as those that existed when the procurement was initiated. The reduction affects the sizing of the facility, the technical solution, the expansion schedule, the level of investment, operational economics, the project's risk profile, the contracting strategy, the technical specifications, and the contractual framework. It is assessed that the change is so substantial that the project cannot be continued on the basis of the existing procurement documents without fundamental modifications. The current procurement documents were prepared on the basis of a different and significantly greater demand than the demand which is now considered realistic. Based on the above mentioned assessment it is considered that DIN Forsyning Teknisk Vand A/S, in its capacity as contracting authority, has objective and legitimate grounds for cancelling the procurement, as the contracting authority's requirements have changed substantially. The change is not considered capable of being accommodated within the existing procurement documents or within the rules governing amendments to contracts. Accordingly, the change must be regarded as affecting fundamental elements of the procurement, as the nature and scope of the contract would differ materially from those contemplated under the original procurement basis. Consequently, if it is decided to proceed with the project on a significantly revised scope, it is considered necessary to conduct a new procurement procedure. DIN Forsyning Teknisk Vand A/S expects that a new procurement will be published in the first half of 2027.
Quality
The Danish Competition and Consumer Authority
The procurement procedure was conducted as a competitive procedure in accordance with the Danish Public Procurement Act (ACT No. 10 of 06 January 2023), section 61-66. The procurement procedure was divided into two phases; (i)a request for participation phase and (ii)a tendering phase, possibly including one or more round(s) of negotiations. DIN Forsyning Teknisk Vand A/S may award the contract based on the initial, revised or final tender. Accordingly, the tenderers cannot expect that negotiations will be conducted. Negotiations can be carried out in a number of successive stages in order to limit the number of tenders which require negotiation. DIN Forsyning Teknisk Vand A/S reserves the right to cancel/change negotiation meetings, request extra negotiation meetings, conduct written/oral negotiations and/or speed up/postpone the submission of revised/final tenders.
When evaluating quality, positive emphasis is placed on the extent to which the tenderer manages to demonstrate the following: That efficient (minimal) operation and maintenance including fully automatic control and good and clear display of on-line measurements are envisaged. An effectful overview of the expected replacements and maintenance, as listed in Contract document 9a Consumption, of the TWTP in the period from year 11 to 30. That process facilities incl. pipe systems, bearings, tanks, etc. as a unified unit appears robust with consistent high quality in all solutions. Proven solutions that are well thought out in relation to DIN Forsyning Teknisk Vand A/S' functional requirements stated in the contract documents. A strong focus on the future operation and maintenance of the plant in relation to the working environment and safety, including access conditions, operation and servicing.
The Danish Complaints Board for Public Procurement
Mercell Holding ASA
DIN Forsyning Teknisk Vand A/S
When evaluating process and collaboration, positive emphasis is placed on the following: The extent to which the tenderer demonstrates and shows knowledge of and understanding to enter into a collaboration on the execution of a project with several professional areas such as designing, building and installing, including in particular: o Involvement of relevant skills/qualifications and stakeholders in the project with focus on broad collaboration. o Demonstrating the ability to work well in teams, share credit, and take responsibility for mistakes. o Showing commitment and willingness to go the extra mile to achieve results. o Communicating effectively and demonstrating a clear Employer (DIN Forsyning Teknisk Vand A/S) and service oriented approach and a good feedback culture. The extent to which the tenderer demonstrates management of the project, where all relevant parties are involved and where there is a focus on contract management among all parties, including in particular: o Ensuring all team members are involved and valued. o Proactively managing and optimization resources and schedules. o Identifying, analyzing and managing risks. o Identifying and incorporating sustainable initiatives. o Ensuring a good transition to operation with a focus on quality assurance, the commissioning process and training. The extent to which the tenderer convincingly demonstrates how the tenderer identifies the biggest challenges in this project in a targeted and controlled manner and in particular how the tenderer proposes to handle the challenges. It is considered positive that the tenderer involves relevant qualifications, stakeholders, tools etc. and shows broad and strong collaboration. In addition, emphasis is placed on: o Involving relevant qualifications and stakeholders in problem-solving. o Demonstrating a proactive approach to identifying and addressing challenges. o Collaborating effectively with all parties to find solutions.
DNK
01
Askekroken 11
[email eliminat]
t-sme
Toldboden 2
none
[telefon eliminat]
[telefon eliminat]
price
https://dinforsyning.dk/
8800
gen-pub
https://mst.dk/erhverv
10
FiscalDocID1
Viborg
DK041
clos-nw
quality
0
32014L0024
1
per-exa
3
can-standard
2000-01-01Z
https://eu.eu-supply.com/ctm/company/companyinformation/index/269437
20
https://naevneneshus.dk/start-din-klage/klagenaevnet-for-udbud/
8baff438-bdca-483a-ab71-6b2c306175f1
173/2026
body-pl
37795526
works
t-no-eea
29
09:25:18+00:00
DK032
eforms-sdk-1.13
RES-0001
Esbjerg N
[telefon eliminat]
Indkøbsafdelingen
30
45252210
complainants
980921565
[email eliminat]
08:40:44+00:00 ••• ••• 40
ted-esen
10294818
neg-w-call
DK012
t-oth-eea
2500
ORG-0003
6700
ORG-0004
t-esubm
43898388
ORG-0001
ORG-0002
chan-need
Oslo
EUR
[telefon eliminat]
NO081
Ulvsundvej 1
[telefon eliminat]
no-eu-funds
https://sktst.dk/
NOR
a1505039-2902-44cb-b360-b3949a80a94e
true
[email eliminat]
6715
ENG
45252100
eSender
EmplDocID1
http://mercell.com/
45000000
EnvDocID1
870e6acd-4bd9-4285-af38-ea6dddb8a99e-01
LOT-[telefon eliminat]
https://kfst.dk
Esbjerg
Carl Jacobsens Vej 35
false
2026-09-08+02:00
[email eliminat]
Valby
2026-09-07+00:00
[telefon eliminat]
Mådevej
tenders
45252123
Lars Skov Bjerrum
UNKNOWN
https://at.dk/
45252120
45252000
Loturi TED
1
3
Technical Water Treatment Plant
45.000.000,00 EUR
This contract notice apply to DIN Forsyning Teknisk Vand A/S' cancellation of the procurement of Technical Water Treatment Plant. Technical Water Treatment Plant is a facility that cleans purified wastewater for use in Power-to-X facilities. In Denmark, the declared goal by 2030 of reducing CO2 emissions by 70% to combat climate change has led to an ambitious plan for Power-to-X, i.e. converting green renewable electricity into fuels (and more) for use in the hard-to-abate sectors, such as the industry, heavy transport, aviation, and shipping transport. DIN Forsyning Teknisk Vand A/S cooperates with companies that want to buy significant quantities of technical water. Technical water is a general term for water that has a different quality than drinking water. The technical water will have a quality as demineralized water. The procurement comprised the complete delivery of a combined plant consisting of: Pure Water Treatment Plant; Reject Water Treatment Plant; buildings; and high voltage installations. The plant is called Technical Water Treatment Plant (TWTP). The TWTP will be located on Mådevej, 6700 Esbjerg. The TWTP must be designed to operate continuously, 24 hours a day, 7 days a week, and 52 weeks a year. The project will be divided in two phases; Phase 1 and Phase 2. Phase 2 is included as an option. The initial phase (Phase 1) will support approximately half of the total capacity. Project capacity: Phase 1 must have a capacity of 230 m³/h output. Phase 2 (option) must have a capacity of 230 m³/h output. The project including the optional Phase 2 must have a capacity of 460 m3/h output. This project also includes a contract for underground piping which is offered in another procurement. DIN Forsyning Teknisk Vand A/S has chosen not to divide the project/contracts further. DIN Forsyning Teknisk Vand A/S has assessed that handling interfaces, responsibilities and risks in particular the contract for TWTP is best placed with the contractor. Further division of the project /contracts will entail increased risk for DIN Forsyning Teknisk Vand A/S, as well as increased costs for construction management etc., which is why DIN Forsyning Teknisk Vand A/S has found it appropriate not to divide the project/contracts further.
45252210 — Lucrari de constructii de statii de purificare a apei
Rezultate și atribuiri TED
LOT-0000
1 oferte primite
Detalii licitație
Descriere
This contract notice apply to DIN Forsyning Teknisk Vand A/S' cancellation of the procurement of Technical Water Treatment Plant. Technical Water Treatment Plant is a facility that cleans purified wastewater for use in Power-to-X facilities. In Denmark, the declared goal by 2030 of reducing CO2 emissions by 70% to combat climate change has led to an ambitious plan for Power-to-X, i.e. converting green renewable electricity into fuels (and more) for use in the hard-to-abate sectors, such as the industry, heavy transport, aviation, and shipping transport. DIN Forsyning Teknisk Vand A/S cooperates with companies that want to buy significant quantities of technical water. Technical water is a general term for water that has a different quality than drinking water. The technical water will have a quality as demineralized water. The procurement comprised the complete delivery of a combined plant consisting of: Pure Water Treatment Plant; Reject Water Treatment Plant; buildings; and high voltage installations. The plant is called Technical Water Treatment Plant (TWTP). The TWTP will be located on Mådevej, 6700 Esbjerg. The TWTP must be designed to operate continuously, 24 hours a day, 7 days a week, and 52 weeks a year. The project will be divided in two phases; Phase 1 and Phase 2. Phase 2 is included as an option. The initial phase (Phase 1) will support approximately half of the total capacity. Project capacity: Phase 1 must have a capacity of 230 m³/h output. Phase 2 (option) must have a capacity of 230 m³/h output. The project including the optional Phase 2 must have a capacity of 460 m3/h output. This project also includes a contract for underground piping which is offered in another procurement. DIN Forsyning Teknisk Vand A/S has chosen not to divide the project/contracts further. DIN Forsyning Teknisk Vand A/S has assessed that handling interfaces, responsibilities and risks in particular the contract for TWTP is best placed with the contractor. Further division of the project /contracts will entail increased risk for DIN Forsyning Teknisk Vand A/S, as well as increased costs for construction management etc., which is why DIN Forsyning Teknisk Vand A/S has found it appropriate not to divide the project/contracts further.
Căutări relevante pentru 617330-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
The Danish Complaints Board for Public Procurement
Organisation name ted esen
Mercell Holding ASA
Organisation partname addinfo LOT
Indkøbsafdelingen
Organisation partname buyer
Indkøbsafdelingen
Organisation partname docprovider LOT
Indkøbsafdelingen
Organisation post code addinfo LOT
6715
Organisation post code buyer
6715
Organisation post code docprovider LOT
6715
Organisation post code reviewinfo LOT
2500
Organisation post code revieworg LOT
8800
Organisation post code ted esen
0277
Organisation street addinfo LOT
Ulvsundvej 1
Organisation street buyer
Ulvsundvej 1
Organisation street docprovider LOT
Ulvsundvej 1
Organisation street reviewinfo LOT
Carl Jacobsens Vej 35
Organisation street revieworg LOT
Toldboden 2
Organisation street ted esen
Askekroken 11
Organisation tel addinfo LOT
[telefon eliminat]
Organisation tel buyer
[telefon eliminat]
Organisation tel docprovider LOT
[telefon eliminat]
Organisation tel reviewinfo LOT
[telefon eliminat]
Organisation tel revieworg LOT
[telefon eliminat]
Organisation tel ted esen
[telefon eliminat]
Competition termination PROC
false
Customization id
eforms-sdk-1.13
Description PROC
This contract notice apply to DIN Forsyning Teknisk Vand A/S' cancellation of the procurement of Technical Water Treatment Plant. Technical Water Treatment Plant is a facility that cleans purified wastewater for use in Power-to-X facilities. In Denmark, the declared goal by 2030 of reducing CO2 emissions by 70% to combat climate change has led to an ambitious plan for Power-to-X, i.e. converting green renewable electricity into fuels (and more) for use in the hard-to-abate sectors, such as the industry, heavy transport, aviation, and shipping transport. DIN Forsyning Teknisk Vand A/S cooperates with companies that want to buy significant quantities of technical water. Technical water is a general term for water that has a different quality than drinking water. The technical water will have a quality as demineralized water. The procurement comprised the complete delivery of a combined plant consisting of: Pure Water Treatment Plant; Reject Water Treatment Plant; buildings; and high voltage installations. The plant is called Technical Water Treatment Plant (TWTP). The TWTP will be located on Mådevej, 6700 Esbjerg. The TWTP must be designed to operate continuously, 24 hours a day, 7 days a week, and 52 weeks a year. The project will be divided in two phases; Phase 1 and Phase 2. Phase 2 is included as an option. The initial phase (Phase 1) will support approximately half of the total capacity. Project capacity: Phase 1 must have a capacity of 230 m³/h output. Phase 2 (option) must have a capacity of 230 m³/h output. The project including the optional Phase 2 must have a capacity of 460 m3/h output. This project also includes a contract for underground piping which is offered in another procurement. DIN Forsyning Teknisk Vand A/S has chosen not to divide the project/contracts further. DIN Forsyning Teknisk Vand A/S has assessed that handling interfaces, responsibilities and risks in particular the contract for TWTP is best placed with the contractor. Further division of the project /contracts will entail increased risk for DIN Forsyning Teknisk Vand A/S, as well as increased costs for construction management etc., which is why DIN Forsyning Teknisk Vand A/S has found it appropriate not to divide the project/contracts further.
Dispatch date
2026-09-07Z
Dispatch date esender
2026-09-07T09:25:18Z
Dispatch time
08:40:44Z
Dispatch time esender
09:25:18Z
Internal identifier PROC
3
NL
1
Non award justification
chan-need
Official language
ENG
Ojs number
173/2026
Place performance street PROC
Mådevej
Previous NOTICE id PROC
870e6acd-4bd9-4285-af38-ea6dddb8a99e-01
Procurement relaunch PROC
false
Provided service type
ted-esen
Publication date
2026-09-08+02:00
Publication number
617330-2026
Received submissions type code
tenders | t-sme | t-esubm | t-oth-eea | t-no-eea
Received submissions type val
1 | 0 | 1 | 1 | 0
Title PROC
Technical Water Treatment Plant
DK032
Description LOT
This contract notice apply to DIN Forsyning Teknisk Vand A/S' cancellation of the procurement of Technical Water Treatment Plant. Technical Water Treatment Plant is a facility that cleans purified wastewater for use in Power-to-X facilities. In Denmark, the declared goal by 2030 of reducing CO2 emissions by 70% to combat climate change has led to an ambitious plan for Power-to-X, i.e. converting green renewable electricity into fuels (and more) for use in the hard-to-abate sectors, such as the industry, heavy transport, aviation, and shipping transport. DIN Forsyning Teknisk Vand A/S cooperates with companies that want to buy significant quantities of technical water. Technical water is a general term for water that has a different quality than drinking water. The technical water will have a quality as demineralized water. The procurement comprised the complete delivery of a combined plant consisting of: Pure Water Treatment Plant; Reject Water Treatment Plant; buildings; and high voltage installations. The plant is called Technical Water Treatment Plant (TWTP). The TWTP will be located on Mådevej, 6700 Esbjerg. The TWTP must be designed to operate continuously, 24 hours a day, 7 days a week, and 52 weeks a year. The project will be divided in two phases; Phase 1 and Phase 2. Phase 2 is included as an option. The initial phase (Phase 1) will support approximately half of the total capacity. Project capacity: Phase 1 must have a capacity of 230 m³/h output. Phase 2 (option) must have a capacity of 230 m³/h output. The project including the optional Phase 2 must have a capacity of 460 m3/h output. This project also includes a contract for underground piping which is offered in another procurement. DIN Forsyning Teknisk Vand A/S has chosen not to divide the project/contracts further. DIN Forsyning Teknisk Vand A/S has assessed that handling interfaces, responsibilities and risks in particular the contract for TWTP is best placed with the contractor. Further division of the project /contracts will entail increased risk for DIN Forsyning Teknisk Vand A/S, as well as increased costs for construction management etc., which is why DIN Forsyning Teknisk Vand A/S has found it appropriate not to divide the project/contracts further.
Electronic auction LOT
false
Employment legislation document id LOT
EmplDocID1
Environmental legislation document id LOT
EnvDocID1
Eu fund LOT
no-eu-funds
Fiscal legislation document id LOT
FiscalDocID1
Gpa LOT
true
Identifier LOT
LOT-0000
Internal identifier LOT
3
Option description LOT
Phase 2 (option) with a capacity of 230 m³/h output.