Anunțul 680473-2026 pentru Danemarca – Izolatori şi accesorii izolante – Framework agreement - Purchase of fittings for glass insulator strings - 26/17723 este publicat de Energinet Eltransmission A/S și este încadrat la codul CPV 44111500.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
The tenders submitted must be valid for a period of six 6 months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of [6] months from the specified time limit for these revised tenders.
Procedure identifier
0b596df0-6033-42ca-ba06-d98fa9577444
Procedure type
neg-w-call
Loc de executare5
Place of performance
DNK
Place of performance country LOT
DNK
Place of performance country PROC
DNK
Place of performance other LOT
anyw-cou
Place of performance other PROC
anyw-cou
Organizații și puncte de contact48
Organisation city addinfo LOT
Fredericia
Organisation city buyer
Fredericia
Organisation city docprovider LOT
Fredericia
Organisation city reviewinfo LOT
Valby
Organisation city revieworg LOT
Viborg
Organisation city ted esen
Odense S
Organisation country addinfo LOT
DNK
Organisation country buyer
DNK
Organisation country docprovider LOT
Rezultate, atribuiri și contracte12
Award criterion description LOT
Prices must be stated in the attached Price List and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List.
Award criterion number LOT
30 | 50 | 20
Award criterion number weight LOT
per-exa
Award criterion type LOT
price | quality
Contract duration period LOT
4
Contract duration start date LOT
2027-02-17+01:00
Contract nature
supplies
Contract nature main LOT
supplies
Loturi6
Additional information LOT
The procurement procedure is being cancelled due to revisions to the selection criteria and minimum requirements applicable to both lots. As these revisions are considered substantial, the procedure will be relaunched on the basis of revised procurement documents.
Eu fund LOT
no-eu-funds
Gpa LOT
true
Identifier LOT
LOT-0001 | LOT-0002
Option description LOT
The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time.
Renewal maximum LOT
2
Acord-cadru și sistem dinamic3
Framework agreement LOT
fa-wo-rc
Framework maximum value CUR LOT
EUR
Framework maximum value LOT
24000000 | 6442953
Alte informații publicate10
Additional info PROC
The procurement procedure is being cancelled due to revisions to the selection criteria and minimum requirements applicable to both lots. As these revisions are considered substantial, the procedure will be relaunched on the basis of revised procurement documents.
Dispatch date
2026-10-01+02:00
Dispatch time
14:06:26+02:00
Entity main activity
electricity
Non award justification
other
Official language
ENG
Ojs number
191/2026
Previous NOTICE id PROC
670046-2026
Received submissions type code
tenders | t-esubm | t-sme | t-no-eea | t-oth-eea
Termene și durate2
Duration period unit LOT
YEAR
Duration period value LOT
4
Autoritate contractantă5
Buyer identifier
39314878
Buyer internet address
https://energinet.dk/
Buyer legal type
pub-undert
Buyer post code
7000
Main activity
electricity
Valori2
Total value
12684564
Total value CUR
EUR
Câștigători și oferte1
Winner selection status
clos-nw
Clasificare CPV2
Main classification type LOT
cpv
Main classification type PROC
cpv
Căi de atac1
Review deadline description LOT
Pursuant to the Danish Act on the Complaints Board for Public Procurement, the following deadlines apply to the submission of complaints: A complaint regarding non-prequalification must be submitted to the Complaints Board for Public Procurement within 20 calendar days from the day following the contracting authority's dispatch of a notification to the candidates concerned identifying who has been selected, cf. section 171(2) of the Danish Public Procurement Act or section 2(1)(1) of the Act on the Complaints Board for Public Procurement, where the notification is accompanied by a statement of reasons for the decision. In other situations, complaints regarding procurement procedures must be submitted to the Complaints Board for Public Procurement within: 1) 45 calendar days after the contracting authority has published a notice in the Official Journal of the European Union announcing that the contracting authority has concluded a contract. The period is calculated from the day following the day on which the notice was published. 2) 30 calendar days calculated from the day following the day on which the contracting authority has notified the tenderers concerned that a contract based on a framework agreement with reopening of competition or a dynamic purchasing system has been concluded, where the notification was accompanied by a statement of reasons for the decision. 3) six months after the contracting authority has concluded a framework agreement, calculated from the day following the day on which the contracting authority has notified the candidates and tenderers concerned, cf. section 2(2) of the Act on the Complaints Board for Public Procurement or section 171(4) of the Danish Public Procurement Act. 4) 20 calendar days calculated from the day following the day on which the contracting authority has announced its decision, cf. section 185(2) of the Danish Public Procurement Act. No later than at the time of submitting a complaint to the Complaints Board for Public Procurement, the complainant must notify the contracting authority in writing that a complaint is being submitted to the Complaints Board for Public Procurement, and whether the complaint has been submitted during the standstill period, cf. section 6(4) of the Act on the Complaints Board for Public Procurement. Where the complaint has not been submitted during the standstill period, the complainant must also state whether suspensive effect of the complaint is requested, cf. section 12(1) of the Act on the Complaints Board for Public Procurement.
Date de contact publicate în TED
17
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
Framework agreement - Purchase of fittings for glass insulator strings - 26/17723
Solution description The tenderer must include documentation of fulfillment and a list of reservations to appendix 2A and 2B. The clarification should be explicit and with explanation as to why the clarification is made. In the evaluation of 'Solution description', Energinet will emphasize the following: Considering the scope and content of the tendered contract the Contracting Authority will focus on to what extend the submitted ensures delivery of high performing, well designed and robust. Beside Specifications in the technical requirements, the elements listed below are of particular importance: • Visual impact from the insulator string design (Drawings of each string type) • The proposed complete string design shall be based on proven design solutions with documented long-term operational experience. • Examples of documented results from design tests, type tests, and sample tests. • Document with handling instructions • Example of labeling of all parts • Description of outside storage in all weather conditions. • Report demonstrating the strings meet the requirement for a minimum corona extinction voltage of 300 kV, based on the voltage gradient method. • It will impact the evaluation positively to the extend the technical description/solution including supporting documents are detailed, thorough and precise. An overall evaluation will be made of the solution description.
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Ap-pendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10.000.000. Maximum value is EUR 24.000.000 • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2.684.563,75. Maximum value is EUR 6.442.953,00 euro. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time.
The tendered framework agreement has a duration of four (4) years. The framework agreement can be extended two (2) times for two (2) years each time.
Delivery time Delivery time must be stated in the attached tender list. When evaluating 'Delivery time', Energinet will evaluate the delivery time in the tender list. The Tenderer shall state the lead time, expressed in calendar weeks, for a typical order consisting of: • 300 suspension strings; and • 30 tension strings. The stated lead time shall be used for evaluation purposes. Evaluation Method Lead time will be evaluated using a linear scoring model, where: • 20 weeks = 10 points • 40 weeks = 5 points • 60 weeks = 0 points Scores for lead times between 20 and 60 weeks will be calculated by linear interpolation. Lead times shorter than 20 weeks will receive the maximum score of 10 points, while lead times longer than 60 weeks will receive 0 points.
Lot 2: Complete glass insulator strings for substations
Danish Competition and Consumer Authority
The tenders submitted must be valid for a period of six 6 months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of [6] months from the specified time limit for these revised tenders.
Prices must be stated in the attached Price List and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List.
Lot 1: Complete glass insulator strings for powerlines
Danish Complaints Board for Public Procurement
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Ap-pendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The value of the framework agreement is expected to amount to EUR 12,684,564 The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10,000,000. Maximum value is EUR 24,000,000 Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
Energinet Eltransmission A/S
Comdia ApS
The procurement procedure is being cancelled due to revisions to the selection criteria and minimum requirements applicable to both lots. As these revisions are considered substantial, the procedure will be relaunched on the basis of revised procurement documents.
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Ap-pendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The value of the framework agreement is expected to amount to EUR 12,684,564 The framework agreement is divided into the following lots: • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2,684,564. Maximum value is EUR 6,442,953. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
Pursuant to the Danish Act on the Complaints Board for Public Procurement, the following deadlines apply to the submission of complaints: A complaint regarding non-prequalification must be submitted to the Complaints Board for Public Procurement within 20 calendar days from the day following the contracting authority's dispatch of a notification to the candidates concerned identifying who has been selected, cf. section 171(2) of the Danish Public Procurement Act or section 2(1)(1) of the Act on the Complaints Board for Public Procurement, where the notification is accompanied by a statement of reasons for the decision. In other situations, complaints regarding procurement procedures must be submitted to the Complaints Board for Public Procurement within: 1) 45 calendar days after the contracting authority has published a notice in the Official Journal of the European Union announcing that the contracting authority has concluded a contract. The period is calculated from the day following the day on which the notice was published. 2) 30 calendar days calculated from the day following the day on which the contracting authority has notified the tenderers concerned that a contract based on a framework agreement with reopening of competition or a dynamic purchasing system has been concluded, where the notification was accompanied by a statement of reasons for the decision. 3) six months after the contracting authority has concluded a framework agreement, calculated from the day following the day on which the contracting authority has notified the candidates and tenderers concerned, cf. section 2(2) of the Act on the Complaints Board for Public Procurement or section 171(4) of the Danish Public Procurement Act. 4) 20 calendar days calculated from the day following the day on which the contracting authority has announced its decision, cf. section 185(2) of the Danish Public Procurement Act. No later than at the time of submitting a complaint to the Complaints Board for Public Procurement, the complainant must notify the contracting authority in writing that a complaint is being submitted to the Complaints Board for Public Procurement, and whether the complaint has been submitted during the standstill period, cf. section 6(4) of the Act on the Complaints Board for Public Procurement. Where the complaint has not been submitted during the standstill period, the complainant must also state whether suspensive effect of the complaint is requested, cf. section 12(1) of the Act on the Complaints Board for Public Procurement.
7000
DNK
10294819
01 ••• ••• 04
Lindvedvej 71
[email eliminat]
neg-w-call
t-sme
DK012
none
Danish Appeals Boards Authority, Toldboden 2
Fredericia
5260
t-oth-eea
2000-01-01+01:00
2500
supplies
price
https://www.kfst.dk/
https://www.comdia.com/
8800
t-esubm
07bb203b-9165-4369-bd37-bd07844f94c1
pub-undert
anyw-cou
50
6442953
70102244
[email eliminat]
[telefon eliminat]
ORG-0001
[telefon eliminat]
Tonne Kjærsvej 65
24000000
Viborg
EUR
https://energinet.dk/
DK041
clos-nw
44111500
no-eu-funds
quality
0
32014L0025
per-exa
2
4
can-standard
10000000
true
2684564
ORG-1001
ORG-1000
20
ORG-1002
ENG
Anja Lorenzen
670046-2026
other
37795526
[telefon eliminat]
t-no-eea
DK031
12684564
eforms-sdk-1.14
DK032
fa-wo-rc
792384
792383
http://www.klfu.dk
RES-0002
RES-0001
LOT-0001
LOT-0002
0b596df0-6033-42ca-ba06-d98fa9577444
2027-02-17+01:00
14:06:26+02:00
39314878
2026-10-01+02:00
[email eliminat]
30
191/2026
Carl Jacobsens Vej 35
false
Odense S
electricity
[email eliminat]
Valby
30442953
792385
tenders
2.3
2026-10-02+02:00
ted-esen
[telefon eliminat]
Loturi TED
2
792384
Lot 1: Complete glass insulator strings for powerlines
10.000.000,00 EUR
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Ap-pendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The value of the framework agreement is expected to amount to EUR 12,684,564 The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10,000,000. Maximum value is EUR 24,000,000 Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
44111500 — Izolatori si accesorii izolante
Durată: 4 YEAR
792385
Lot 2: Complete glass insulator strings for substations
2.684.564,00 EUR
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Ap-pendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The value of the framework agreement is expected to amount to EUR 12,684,564 The framework agreement is divided into the following lots: • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2,684,564. Maximum value is EUR 6,442,953. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
44111500 — Izolatori si accesorii izolante
Durată: 4 YEAR
Rezultate și atribuiri TED
LOT-0001
LOT-0002
Detalii licitație
Descriere
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Ap-pendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10.000.000. Maximum value is EUR 24.000.000 • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2.684.563,75. Maximum value is EUR 6.442.953,00 euro. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.