Anunțul 684414-2026 pentru Danemarca – Izolatori şi accesorii izolante – Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723 este publicat de Energinet Eltransmission A/S și este încadrat la codul CPV 44111500.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
The tenders submitted must be valid for a period of six (6) months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders. It should be noted that this is a negotiated procedure. With the exception of basic elements, changes may be made to tender documents and their contents as a consequence as part of the negotiation process. The tenderer's legal form is not required. If you wish to apply to participate in this tender process, the corresponding ESPD must be filled in. The ESPD for this tender process can be found in Comdia. The ESPD must be filled in in Comdia, after which it is submitted via "Save and Send". Guidelines for completing the ESPD can be found on the website of the Konkurrence- og Forbrugerstyrelsen, www.kfst.dk (The contracting entity does not take responsibility for the content of the guidance). Please note the following: - An applicant who participates alone, but relies on the capacity of one or more other entities (e.g. a parent company or sister company or subcontractor) shall ensure that the application is accompanied by both the applicant's own ESPD and a separate ESPD for each entity on which it wishes to rely, with a completed Part II "Information on the economic operator" and Part III "Grounds for exclusion" as well as relevant information concerning Part IV "Selection criteria" and Part V: "Limiting the number of qualified applicants". The attached ESPD from those other entities should be duly completed and signed. In addition, the submission of final evidence must also be accompanied by evidence of the commitment of these entities/subcontractors in this respect in the form of a statement of support. - Where groups of economic operators, including temporary associations, apply together, a full ESPD shall be filled in separately for each participating economic operator containing the required information. The final documentation must also be accompanied by a Consortium Declaration, by which the parties declare to be a consortium or other form of association jointly and severally, unconditionally, and directly liable for the fulfilment of the contract tendered.
Document restricted LOT
Rezultate, atribuiri și contracte11
Award criterion description LOT
Prices must be stated in the attached Price List and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List.
Award criterion number LOT
30 | 50 | 20
Award criterion number weight LOT
per-exa
Award criterion type LOT
price | quality
Contract duration period LOT
8
Contract duration start date LOT
2027-02-17+01:00
Contract nature
supplies
Contract nature main LOT
supplies
Alte informații publicate14
Additional info PROC
The tenders submitted must be valid for a period of six (6) months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders. It should be noted that this is a negotiated procedure. With the exception of basic elements, changes may be made to tender documents and their contents as a consequence as part of the negotiation process. The tenderer's legal form is not required. If you wish to apply to participate in this tender process, the corresponding ESPD must be filled in. The ESPD for this tender process can be found in Comdia. The ESPD must be filled in in Comdia, after which it is submitted via "Save and Send". Guidelines for completing the ESPD can be found on the website of the Konkurrence- og Forbrugerstyrelsen, www.kfst.dk (The contracting entity does not take responsibility for the content of the guidance). Please note the following: - An applicant who participates alone, but relies on the capacity of one or more other entities (e.g. a parent company or sister company or subcontractor) shall ensure that the application is accompanied by both the applicant's own ESPD and a separate ESPD for each entity on which it wishes to rely, with a completed Part II "Information on the economic operator" and Part III "Grounds for exclusion" as well as relevant information concerning Part IV "Selection criteria" and Part V: "Limiting the number of qualified applicants". The attached ESPD from those other entities should be duly completed and signed. In addition, the submission of final evidence must also be accompanied by evidence of the commitment of these entities/subcontractors in this respect in the form of a statement of support. - Where groups of economic operators, including temporary associations, apply together, a full ESPD shall be filled in separately for each participating economic operator containing the required information. The final documentation must also be accompanied by a Consortium Declaration, by which the parties declare to be a consortium or other form of association jointly and severally, unconditionally, and directly liable for the fulfilment of the contract tendered.
Dispatch date
Termene și durate5
Deadline receipt request
2026-11-02T12:00:00+01:00
Deadline receipt request date LOT
2026-11-02+01:00
Deadline receipt request time LOT
12:00:00+01:00
Duration period unit LOT
YEAR
Duration period value LOT
8
Autoritate contractantă4
Buyer identifier
39314878
Buyer legal type
pub-undert
Buyer post code
7000
Main activity
electricity
Loc de executare5
Place of performance
DNK
Place of performance country LOT
DNK
Place of performance country PROC
DNK
Place of performance other LOT
anyw-cou
Place of performance other PROC
anyw-cou
Acord-cadru și sistem dinamic4
Framework agreement LOT
fa-wo-rc
Framework maximum participants number LOT
2
Framework maximum value CUR LOT
EUR
Framework maximum value LOT
24000000 | 6442953
Procedură și anunț5
Legal basis
32014L0025
Legal basis NOTICE
32014L0025
Procedure features
Tender with negotiation - The tenders submitted must be valid for a period of six (6) months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders. .
Procedure identifier
cd788c77-0322-4a48-9f84-b67323d21350
Procedure type
neg-w-call
Clasificare CPV2
Main classification type LOT
cpv
Main classification type PROC
cpv
Valori2
Total value
12684564
Total value CUR
EUR
Căi de atac1
Review deadline description LOT
Pursuant to the Danish Act on the Complaints Board for Public Procurement, the following deadlines apply to the submission of complaints: A complaint regarding non-prequalification must be submitted to the Complaints Board for Public Procurement within 20 calendar days from the day following the contracting authority's dispatch of a notification to the candidates concerned identifying who has been selected, cf. section 171(2) of the Danish Public Procurement Act or section 2(1)(1) of the Act on the Complaints Board for Public Procurement, where the notification is accompanied by a statement of reasons for the decision. In other situations, complaints regarding procurement procedures must be submitted to the Complaints Board for Public Procurement within: 1) 45 calendar days after the contracting authority has published a notice in the Official Journal of the European Union announcing that the contracting authority has concluded a contract. The period is calculated from the day following the day on which the notice was published. 2) 30 calendar days calculated from the day following the day on which the contracting authority has notified the tenderers concerned that a contract based on a framework agreement with reopening of competition or a dynamic purchasing system has been concluded, where the notification was accompanied by a statement of reasons for the decision. 3) six months after the contracting authority has concluded a framework agreement, calculated from the day following the day on which the contracting authority has notified the candidates and tenderers concerned, cf. section 2(2) of the Act on the Complaints Board for Public Procurement or section 171(4) of the Danish Public Procurement Act. 4) 20 calendar days calculated from the day following the day on which the contracting authority has announced its decision, cf. section 185(2) of the Danish Public Procurement Act. No later than at the time of submitting a complaint to the Complaints Board for Public Procurement, the complainant must notify the contracting authority in writing that a complaint is being submitted to the Complaints Board for Public Procurement, and whether the complaint has been submitted during the standstill period, cf. section 6(4) of the Act on the Complaints Board for Public Procurement. Where the complaint has not been submitted during the standstill period, the complainant must also state whether suspensive effect of the complaint is requested, cf. section 12(1) of the Act on the Complaints Board for Public Procurement.
Date de contact publicate în TED
23
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
Has the economic operator itself or any person who is a member of its administrative, management or supervisory body or has powers of representation, decision or control therein been the subject of a conviction by final judgment for fraud, by a conviction rendered at the most five years ago or in which an exclusion period set out directly in the conviction continues to be applicable? Within the meaning of Article 1 of the Convention on the protection of the European Communities' financial interests (OJ C 316, 27.11.1995, p. 48). For Danish applicants/tenderers the documentation is entailed in the “Serviceattest” which can be acquired from the Danish Business Authority. The time frame from request of a Serviceattest until receipt is usually two weeks. For foreign applicants/tenderers it is the experience of the Contracting Authority that the time frame for receipt of this documentation varies within the individual member states. As a result, The Contracting Authority strongly advises foreign applicants/tenderers to obtain this documentation as early as possible. Preferably the documentation should be ready and available already in connection with the prequalification. The EU Commission has launched e-CERTIS, a free, on-line source of information to help companies and contracting authorities to deal with different forms of documentary evidence required when tendering for public contracts. Information regarding relevant certificates can be obtained from: https://ec.europa.eu/tools/ecertis/#/search
Solution description The tenderer must include documentation of fulfillment and a list of reservations to appendix 2A and 2B. The clarification should be explicit and with explanation as to why the clarification is made. In the evaluation of 'Solution description', Energinet will emphasize the following: Considering the scope and content of the tendered contract the Contracting Authority will focus on to what extend the submitted ensures delivery of high performing, well designed and robust. Besides, Specifications in the technical requirements, the elements listed below are of particular importance: • Visual impact from the insulator string design (Drawings of each string type) • The proposed complete string design shall be based on proven design solutions with documented long-term operational experience. • Examples of documented results from design tests, type tests, and sample tests. • Document with handling instructions • Example of labeling of all parts • Description of outside storage in all weather conditions. • Report demonstrating the strings meet the requirement for a minimum corona extinction voltage of 300 kV, based on the voltage gradient method. • It will impact the evaluation positively to the extent the technical description/solution including supporting documents are detailed, thorough and precise. An overall evaluation will be made of the solution description.
Danish Competition and Consumer Authority
Prices must be stated in the attached Price List and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List.
Lot 1: Complete glass insulator strings for powerlines
Has the economic operator or an undertaking related to it advised the contracting authority or contracting entity or otherwise been involved in the preparation of the procurement procedure?
Has the economic operator itself or any person who is a member of its administrative, management or supervisory body or has powers of representation, decision or control therein been the subject of a conviction by final judgment for participation in a criminal organisation, by a conviction rendered at the most five years ago or in which an exclusion period set out directly in the conviction continues to be applicable? As defined in Article 2 of Council Framework Decision 2008/841/JHA of 24 October 2008 on the fight against organised crime (OJ L 300, 11.11.2008, p. 42). For Danish applicants/tenderers the documentation is entailed in the “Serviceattest” which can be acquired from the Danish Business Authority. The time frame from request of a Serviceattest until receipt is usually two weeks. For foreign applicants/tenderers it is the experience of the Contracting Authority that the time frame for receipt of this documentation varies within the individual member states. As a result, The Contracting Authority strongly advises foreign applicants/tenderers to obtain this documentation as early as possible. Preferably the documentation should be ready and available already in connection with the prequalification. The EU Commission has launched e-CERTIS, a free, on-line source of information to help companies and contracting authorities to deal with different forms of documentary evidence required when tendering for public contracts. Information regarding relevant certificates can be obtained from: https://ec.europa.eu/tools/ecertis/#/search
The tenders submitted must be valid for a period of six (6) months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders. It should be noted that this is a negotiated procedure. With the exception of basic elements, changes may be made to tender documents and their contents as a consequence as part of the negotiation process. The tenderer's legal form is not required. If you wish to apply to participate in this tender process, the corresponding ESPD must be filled in. The ESPD for this tender process can be found in Comdia. The ESPD must be filled in in Comdia, after which it is submitted via "Save and Send". Guidelines for completing the ESPD can be found on the website of the Konkurrence- og Forbrugerstyrelsen, www.kfst.dk (The contracting entity does not take responsibility for the content of the guidance). Please note the following: - An applicant who participates alone, but relies on the capacity of one or more other entities (e.g. a parent company or sister company or subcontractor) shall ensure that the application is accompanied by both the applicant's own ESPD and a separate ESPD for each entity on which it wishes to rely, with a completed Part II "Information on the economic operator" and Part III "Grounds for exclusion" as well as relevant information concern-ing Part IV "Selection criteria" and Part V: "Limiting the number of qualified applicants". The attached ESPD from those other entities should be duly com-pleted and signed. In addition, the submission of final evidence must also be accompanied by evidence of the commitment of these entities/subcontractors in this respect in the form of a statement of support. - Where groups of economic operators, including temporary associations, apply together, a full ESPD shall be filled in separately for each participatng economic operator containing the required information. The final documentation must also be accompanied by a Consortium Declaration, by which the parties declare to be a consortium or other form of association jointly and severally, unconditionally, and directly liable for the fulfilment of the contract tendered.
Can the economic operator confirm that: a) It has been guilty of serious misrepresentation in supplying the information required for the verification of the absence of grounds for exclusion or the fulfilment of the selection criteria, b) It has withheld such information, c) It has not been able, without delay, to submit the supporting documents required by a contracting authority or contracting entity, and d) It has undertaken to unduly influence the decision making process of the contracting authority or contracting entity, to obtain confidential information that may confer upon it undue advantages in the procurement procedure or to negligently provide misleading information that may have a material influence on decisions concerning exclusion, selection or award?
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Appendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2.684.563,75. Maximum value is EUR 6.442.953,00 euro. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
Energinet Eltransmission A/S
The applicant must confirm the economic ability in the ESPD part IV.B with information from the latest annual report regarding the following economic indicators: 1. Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.) 2. Equity ratio (equity/total assets). This must be stated with two decimals. If the applicant relies on the capacities of other entities or the applicant is a group of economic operators the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities. It is the sole responsibility of the applicant to secure that the minimum requirements are reached based on consolidation when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators. Minimum requirement: Lot 2: Equity from the latest annual report must at the time limit for receipt of tenders be at least EUR 675.000 Equity ratio from the latest annual report must, at the time of prequalification, be at least 20 pct. If the equity ratio is between 15 pct. and 20 pct. the tenderer can qualify if Equity exceeds EUR 2.025.000
The applicant must confirm the economic ability in the ESPD part IV.B with information from the latest annual report regarding the following economic indicators: 1. Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.) 2. Equity ratio (equity/total assets). This must be stated with two decimals. If the applicant relies on the capacities of other entities or the applicant is a group of economic operators the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities. It is the sole responsibility of the applicant to secure that the minimum requirements are reached based on consolidation when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators. Minimum requirement: Lot 1: Equity from the latest annual report must at the time limit for receipt of tenders be at least EUR EUR 2.500.000 Equity ratio from the latest annual report must, at the time of prequalification, be at least 20 pct. If the equity ratio is between 15 pct. and 20 pct. the applicant can qualify if Equity exceeds EUR 7.500.000
Pursuant to the Danish Act on the Complaints Board for Public Procurement, the following deadlines apply to the submission of complaints: A complaint regarding non-prequalification must be submitted to the Complaints Board for Public Procurement within 20 calendar days from the day following the contracting authority's dispatch of a notification to the candidates concerned identifying who has been selected, cf. section 171(2) of the Danish Public Procurement Act or section 2(1)(1) of the Act on the Complaints Board for Public Procurement, where the notification is accompanied by a statement of reasons for the decision. In other situations, complaints regarding procurement procedures must be submitted to the Complaints Board for Public Procurement within: 1) 45 calendar days after the contracting authority has published a notice in the Official Journal of the European Union announcing that the contracting authority has concluded a contract. The period is calculated from the day following the day on which the notice was published. 2) 30 calendar days calculated from the day following the day on which the contracting authority has notified the tenderers concerned that a contract based on a framework agreement with reopening of competition or a dynamic purchasing system has been concluded, where the notification was accompanied by a statement of reasons for the decision. 3) six months after the contracting authority has concluded a framework agreement, calculated from the day following the day on which the contracting authority has notified the candidates and tenderers concerned, cf. section 2(2) of the Act on the Complaints Board for Public Procurement or section 171(4) of the Danish Public Procurement Act. 4) 20 calendar days calculated from the day following the day on which the contracting authority has announced its decision, cf. section 185(2) of the Danish Public Procurement Act. No later than at the time of submitting a complaint to the Complaints Board for Public Procurement, the complainant must notify the contracting authority in writing that a complaint is being submitted to the Complaints Board for Public Procurement, and whether the complaint has been submitted during the standstill period, cf. section 6(4) of the Act on the Complaints Board for Public Procurement. Where the complaint has not been submitted during the standstill period, the complainant must also state whether suspensive effect of the complaint is requested, cf. section 12(1) of the Act on the Complaints Board for Public Procurement.
See template for contract.
The suitability of applicants fulfilling the minimum requirements to economic and financial standing will be assessed based on technical and professional ability. The ability will be assessed based on references which can be filled in ESPD part IV.C. The applicant shall submit three (3) to five (5) most comparable and relevant references un-dertaken in the five (5) years as part of the application. By "undertaken in the past 5 years” implies that the reference must not have been completed prior to the date reached when counting five (5) years backwards from the submission date for prequalification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, however the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section 2.3. The references may include a description of the work involving glass insulators and indicate whether the supply covered the complete insulator string (glass insulators and fittings) or whether the glass insulators and fittings were supplied separately, and include - Quantity: Comparable to the quantities specified in Appendix 3A– Pricelist Substations and Appendix 3B – Pricelist Power Lines. - Contract Value: Approximately equivalent to the value of the current contract, where possible. - Weather Conditions: The reference projects should be located in areas with weather and environmental conditions comparable to those in Denmark. Please describe the relevant conditions where applicable. - Country: Specify the country in which the reference project was carried out. - Customer Reference: Name of the recipient/customer, including the name of the contact person and their contact details (e-mail address and telephone num-ber).Project Timeline: Date of contract award/initiation and date of final delivery (day, month, year). Glass insulators are supposed to be delivered in both of the lots why demands for references are applicable for both lots. Any ambiguities and/or incomprehensibilities may have a negative effect on the selection of applicants. Please note the “description” box in ESPD part IV.C. can contain more text than is visible and it is possible to copy paste text into the box. The number of references should not surpass a maximum of the five (5) most comparable and relevant references. If the applicant is relying on the capacity of other entities or the applicant is a group of economic operators the maximum number of references to be submitted must still be respected and cannot exceed five (5) when combined. If more than five (5) references are submitted, the Contracting Authority will ask the applicant to clarify which five (5) refer-ences should be included. If the applicant relies on other entities capacity or is part of a group of economic operators, the information concerning ESPD part IV.C must be submitted in separate ESPD’s for each entity. Minimum requirement: These minimum requirements both regard Lot 1: Complete glass strings for powerlines and Lot 2: Complete glass strings for substations: - At least one reference must demonstrate the supply of glass insulators for use in a transmission network with a voltage level of at least 132 kV.
Has the economic operator breached its obligations relating to the payment social security contributions, both in the country in which it is established and in Member State of the contracting authority or contracting entity if other than the country of establishment? For Danish applicants/tenderers the documentation is entailed in the “Serviceattest” which can be acquired from the Danish Business Authority. The time frame from request of a Serviceattest until receipt is usually two weeks. For foreign applicants/tenderers it is the experience of the Contracting Authority that the time frame for receipt of this documentation varies within the individual member states. As a result, The Contracting Authority strongly advises foreign applicants/tenderers to obtain this documentation as early as possible. Preferably the documentation should be ready and available already in connection with the prequalification. The EU Commission has launched e-CERTIS, a free, on-line source of information to help companies and contracting authorities to deal with different forms of documentary evidence required when tendering for public contracts. Information regarding relevant certificates can be obtained from: https://ec.europa.eu/tools/ecertis/#/search
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Appendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10.000.000. Maximum value is EUR 24.000.000 • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2.684.563,75. Maximum value is EUR 6.442.953,00 euro. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
Delivery time Delivery time must be stated in the attached tender list. When evaluating 'Delivery time', Energinet will evaluate the delivery time in the tender list. The Tenderer shall state the lead time, expressed in calendar weeks, for a typical order consisting of: • 300 suspension strings; and • 30 tension strings. The stated lead time shall be used for evaluation purposes. Evaluation Method Lead time will be evaluated using a linear scoring model, where: • 20 weeks = 10 points • 40 weeks = 5 points • 60 weeks = 0 points Scores for lead times between 20 and 60 weeks will be calculated by linear interpolation. Lead times shorter than 20 weeks will receive the maximum score of 10 points, while lead times longer than 60 weeks will receive 0 points.
Has the economic operator itself or any person who is a member of its administrative, management or supervisory body or has powers of representation, decision or control therein been the subject of a conviction by final judgment for child labour and other forms of trafficking in human beings, by a conviction rendered at the most five years ago or in which an exclusion period set out directly in the conviction continues to be applicable? As defined in Article 2 of Directive 2011/36/EU of the European Parliament and of the Council of 5 April 2011 on preventing and combating trafficking in human beings and protecting its victims, and replacing Council Framework Decision 2002/629/JHA (OJ L 101, 15.4.2011, p. 1). For Danish applicants/tenderers the documentation is entailed in the “Serviceattest” which can be acquired from the Danish Business Authority. The time frame from request of a Serviceattest until receipt is usually two weeks. For foreign applicants/tenderers it is the experience of the Contracting Authority that the time frame for receipt of this documentation varies within the individual member states. As a result, The Contracting Authority strongly advises foreign applicants/tenderers to obtain this documentation as early as possible. Preferably the documentation should be ready and available already in connection with the prequalification. The EU Commission has launched e-CERTIS, a free, on-line source of information to help companies and contracting authorities to deal with different forms of documentary evidence required when tendering for public contracts. Information regarding relevant certificates can be obtained from: https://ec.europa.eu/tools/ecertis/#/search
2 x 24 måneder
Lot 2 Complete glass insulator strings for substations
Has the economic operator itself or any person who is a member of its administrative, management or supervisory body or has powers of representation, decision or control therein been the subject of a conviction by final judgment for money laundering or terrorist financing, by a conviction rendered at the most five years ago or in which an exclusion period set out directly in the conviction continues to be applicable? As defined in Article 1 of Directive 2005/60/EC of the European Parliament and of the Council of 26 October 2005 on the prevention of the use of the financial system for the purpose of money laundering and terrorist financing (OJ L 309, 25.11.2005, p. 15). For Danish applicants/tenderers the documentation is entailed in the “Serviceattest” which can be acquired from the Danish Business Authority. The time frame from request of a Serviceattest until receipt is usually two weeks. For foreign applicants/tenderers it is the experience of the Contracting Authority that the time frame for receipt of this documentation varies within the individual member states. As a result, The Contracting Authority strongly advises foreign applicants/tenderers to obtain this documentation as early as possible. Preferably the documentation should be ready and available already in connection with the prequalification. The EU Commission has launched e-CERTIS, a free, on-line source of information to help companies and contracting authorities to deal with different forms of documentary evidence required when tendering for public contracts. Information regarding relevant certificates can be obtained from: https://ec.europa.eu/tools/ecertis/#/search
See the tender materiel. The tenderer's legal form is not required. If applications and tenders are submitted by a consortium, all participants in the consortium must be jointly and severally liable for the performance of the con-tract and a consortium member must be appointed with whom a binding agreement can be concluded on behalf of the consortium”
Is the economic operator guilty of grave professional misconduct? Where applicable, see definitions in national law, the relevant notice or the procurement documents.
Is the economic operator aware of any conflict of interest, as indicated in national law, the relevant notice or the procurement documents due to its participation in the procurement procedure?
The tenders submitted must be valid for a period of six (6) months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders. It should be noted that this is a negotiated procedure. With the exception of basic elements, changes may be made to tender documents and their contents as a consequence as part of the negotiation process. The tenderer's legal form is not required. If you wish to apply to participate in this tender process, the corresponding ESPD must be filled in. The ESPD for this tender process can be found in Comdia. The ESPD must be filled in in Comdia, after which it is submitted via "Save and Send". Guidelines for completing the ESPD can be found on the website of the Konkurrence- og Forbrugerstyrelsen, www.kfst.dk (The contracting entity does not take responsibility for the content of the guidance). Please note the following: - An applicant who participates alone, but relies on the capacity of one or more other entities (e.g. a parent company or sister company or subcontractor) shall ensure that the application is accompanied by both the applicant's own ESPD and a separate ESPD for each entity on which it wishes to rely, with a completed Part II "Information on the economic operator" and Part III "Grounds for exclusion" as well as relevant information concerning Part IV "Selection criteria" and Part V: "Limiting the number of qualified applicants". The attached ESPD from those other entities should be duly completed and signed. In addition, the submission of final evidence must also be accompanied by evidence of the commitment of these entities/subcontractors in this respect in the form of a statement of support. - Where groups of economic operators, including temporary associations, apply together, a full ESPD shall be filled in separately for each participating economic operator containing the required information. The final documentation must also be accompanied by a Consortium Declaration, by which the parties declare to be a consortium or other form of association jointly and severally, unconditionally, and directly liable for the fulfilment of the contract tendered.
See the tender materiel. The tenderer's legal form is not required. If applications and tenders are submitted by a consortium, all participants in the consortium must be jointly and severally liable for the performance of the contract and a consortium member must be appointed with whom a binding agreement can be concluded on behalf of the consortium”
Tender with negotiation - The tenders submitted must be valid for a period of six (6) months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders. .
Has the economic operator itself or any person who is a member of its administrative, management or supervisory body or has powers of representation, decision or control therein been the subject of a conviction by final judgment for corruption, by a conviction rendered at the most five years ago or in which an exclusion period set out directly in the conviction continues to be applicable? As defined in Article 3 of the Convention on the fight against corruption involving officials of the European Communities or officials of Member States of the European Union, OJ C 195, 25.6.1997, p. 1, and in Article 2(1) of Council Framework Decision 2003/568/JHA of 22 July 2003 on combating corruption in the private sector (OJ L 192, 31.7.2003, p. 54). This exclusion ground also includes corruption as defined in the national law of the contracting authority (contracting entity) or the economic operator. " For Danish applicants/tenderers the documentation is entailed in the “Serviceattest” which can be acquired from the Danish Business Authority. The time frame from request of a Serviceattest until receipt is usually two weeks. For foreign applicants/tenderers it is the experience of the Contracting Authority that the time frame for receipt of this documentation varies within the individual member states. As a result, The Contracting Authority strongly advises foreign applicants/tenderers to obtain this documentation as early as possible. Preferably the documentation should be ready and available already in connection with the prequalification. The EU Commission has launched e-CERTIS, a free, on-line source of information to help companies and contracting authorities to deal with different forms of documentary evidence required when tendering for public contracts. Information regarding relevant certificates can be obtained from: https://ec.europa.eu/tools/ecertis/#/search
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Appendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10.000.000. Maximum value is EUR 24.000.000 Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
Danish Complaints Board for Public Procurement
Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723
The contracting entity shall exclude a candidate or tenderer who has unpaid overdue debts of DKK 100,000 or more to public authorities relating to taxes, duties or social security contributions under Danish law or the law of the country in which the applicant or tenderer is established. Documentation: in accordance with sections 152-153 of the Danish Public Procurement Act.
Comdia ApS
See template for contract
See tender material
See tender material.
Has the economic operator itself or any person who is a member of its administrative, management or supervisory body or has powers of representation, decision or control therein been the subject of a conviction by final judgment for terrorist offences or offences linked to terrorist activities, by a conviction rendered at the most five years ago or in which an exclusion period set out directly in the conviction continues to be applicable? As defined in Articles 1 and 3 of Council Framework Decision of 13 June 2002 on combating terrorism (OJ L 164, 22.6.2002, p. 3). This exclusion ground also includes inciting or aiding or abetting or attempting to commit an offence, as referred to in Article 4 of that Framework Decision. For Danish applicants/tenderers the documentation is entailed in the “Serviceattest” which can be acquired from the Danish Business Authority. The time frame from request of a Serviceattest until receipt is usually two weeks. For foreign applicants/tenderers it is the experience of the Contracting Authority that the time frame for receipt of this documentation varies within the individual member states. As a result, The Contracting Authority strongly advises foreign applicants/tenderers to obtain this documentation as early as possible. Preferably the documentation should be ready and available already in connection with the prequalification. The EU Commission has launched e-CERTIS, a free, on-line source of information to help companies and contracting authorities to deal with different forms of documentary evidence required when tendering for public contracts. Information regarding relevant certificates can be obtained from: https://ec.europa.eu/tools/ecertis/#/search
DNK
01 ••• ••• 04
[email eliminat]
none
exg-mis-prep-confl
required
Fredericia
5260
supplies
price
https://www.kfst.dk/
8800
6442953
Tonne Kjærsvej 65
Viborg
17
DK041
44111500
quality
32014L0025
slc-abil-ref-supply
per-exa
1
2
4
late-some
1[telefon eliminat]
exg-crim-fraud
ORG-1001
https://www.comdia.com/energinet/tenderinformationshow.aspx?Id=810100
ORG-1000
non-restricted-document
20
ORG-1[telefon eliminat]
DK031
12684564
eforms-sdk-1.14
DK032
13:47:04+02:00 ••• ••• 17+01:00
DOC-[telefon eliminat]
exg-mis-partic-confl
810100
Odense S
electricity
[email eliminat]
2026-10-05+02:00
2.3
ted-esen
7[telefon eliminat]a402372-8d09-4f9e-a19e-563fcd21fd7a
[email eliminat]
Lindvedvej 71
neg-w-call
exg-crim-part
DK012
Danish Appeals Boards Authority, Toldboden 2
2500
https://www.comdia.com/
cn-standard
pub-undert
anyw-cou
50
70102244
ORG-0001
[telefon eliminat]
exg-crim-traffick
EUR
810168
exg-crim-terror
epo-notice
no-eu-funds
exg-pmt-bre-tax
614140-2026
true
192/2026
ENG
no
[telefon eliminat]
fa-wo-rc
http://www.klfu.dk
not-allowed
exg-mis-misrepresent
LOT-0001
LOT-0002
slc-stand-ratio
exg-mis-misconduct
Procurement- A
[email eliminat]
12:00:00+01:00
Carl Jacobsens Vej 35
exg-pmt-bre-ssc
false
2026-11-02+01:00
exg-crim-laund
Valby
performance
30442953
cd788c77-0322-4a48-9f84-b67323d21350
exg-crim-corrpt
2026-10-02+02:00
[telefon eliminat]
Loturi TED
2
810138
Lot 1: Complete glass insulator strings for powerlines
10.000.000,00 EUR
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Appendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10.000.000. Maximum value is EUR 24.000.000 Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
44111500 — Izolatori si accesorii izolante
Durată: 8 YEAR
810168
Lot 2 Complete glass insulator strings for substations
2.684.564,00 EUR
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Appendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2.684.563,75. Maximum value is EUR 6.442.953,00 euro. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
44111500 — Izolatori si accesorii izolante
Durată: 8 YEAR
Detalii licitație
Descriere
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Appendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10.000.000. Maximum value is EUR 24.000.000 • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2.684.563,75. Maximum value is EUR 6.442.953,00 euro. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.
Căutări relevante pentru 684414-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
The applicant must confirm the economic ability in the ESPD part IV.B with information from the latest annual report regarding the following economic indicators: 1. Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.) 2. Equity ratio (equity/total assets). This must be stated with two decimals. If the applicant relies on the capacities of other entities or the applicant is a group of economic operators the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities. It is the sole responsibility of the applicant to secure that the minimum requirements are reached based on consolidation when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators. Minimum requirement: Lot 1: Equity from the latest annual report must at the time limit for receipt of tenders be at least EUR EUR 2.500.000 Equity ratio from the latest annual report must, at the time of prequalification, be at least 20 pct. If the equity ratio is between 15 pct. and 20 pct. the applicant can qualify if Equity exceeds EUR 7.500.000
See the tender materiel. The tenderer's legal form is not required. If applications and tenders are submitted by a consortium, all participants in the consortium must be jointly and severally liable for the performance of the con-tract and a consortium member must be appointed with whom a binding agreement can be concluded on behalf of the consortium”
Is the economic operator guilty of grave professional misconduct? Where applicable, see definitions in national law, the relevant notice or the procurement documents.