Anunțul 729386-2026 pentru Norvegia – Lucrări de construcţii complete sau parţiale şi lucrări publice – Loppa municipality - Molo - Øksfjord Harbour este publicat de Loppa kommune și este încadrat la codul CPV 45200000.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
Extended deadline for submitting tenders in the competition.
Change NOTICE version identifier
231a539e-a279-4869-aa0e-93e23decac06-01
Change previous NOTICE section identifier
PROCEDURE | LOT-0000
Change reason code
update-add
Change reason description
The competition is updated with an extended tender deadline. The deadline for receipt of tenders is now 09 ••• ••• 12:00). The deadline for submitting questions is 02.11.26, 12:00. The schedule sketched in part 1 under chapter 1.9 can, therefore, be moved as a result.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Exclusion grounds source PROC
epo-notice
Official language
ENG
Ojs number
204/2026
Selection criteria source
epo-acc-espd-request
Submission language
NOR
Procedură și anunț8
Legal basis
32014L0024
Legal basis NOTICE
32014L0024
Legal basis PROC
Anskaffelsesforskriften
Legal basis text
The competition will be carried out in accordance with the procedure for procurements above the EEA thresholds, cf. FOA part III,
NOTICE preferred publication date
2026-10-20T00:00:00Z
Procedure features
The procurement will be made in accordance with the Public Procurements Act of 17 June 2016, last amended 6 March 2026, valid from 1 July 2026 and the Public Procurement Regulations (FOA) dated 12 August 2016, last amended 14 April 2026, valid from 1 July 2026. The competition will be carried out in accordance with the procedure for procurements above the EEA thresholds, cf. PPR part III.
The price (weighting 70%) shall be in the completed tender form. Price means all works and options included in the tender form, excluding VAT. Any reservations and/or deviations will be described in the tender letter with the stated price consequences.
Award criterion name LOT
Price
Award criterion number fixed LOT
fix-tot
Award criterion number LOT
70 | 15
Award criterion type LOT
cost | quality
Contract duration end date LOT
2027-11-05Z
Contract duration start date LOT
2026-12-18Z
Contract nature
works
Termene și durate3
Deadline date LOT
2026-11-02Z
Deadline receipt request
2026-11-09T11:00:00Z
Deadline time LOT
15:00:00Z
Autoritate contractantă6
Authority main activity
econ-aff
Buyer identifier
963 063 237
Buyer legal type
body-pl-la
Buyer partname
Loppa kommune
Buyer post code
9550
Main activity
econ-aff
Valori2
Total value
95000000
Total value CUR
NOK
Clasificare CPV2
Main classification type LOT
cpv
Main classification type PROC
cpv
Căi de atac1
Review deadline description LOT
c.f. the Tender Documentation. the tender documentation and the procurement regulations.
Date de contact publicate în TED
8
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
The contractor ́s collateral shall be established and approved by the project manager before payment of 1st instalment. Building form 8406 B is used as the form for guarantee declaration.
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Competence
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
Loppa municipality - Molo - Øksfjord Harbour
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Extended deadline for submitting tenders.
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
The procurement will be made in accordance with the Public Procurements Act of 17 June 2016, last amended 6 March 2026, valid from 1 July 2026 and the Public Procurement Regulations (FOA) dated 12 August 2016, last amended 14 April 2026, valid from 1 July 2026. The competition will be carried out in accordance with the procedure for procurements above the EEA thresholds, cf. PPR part III.
c.f. the Tender Documentation. the tender documentation and the procurement regulations.
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
Exercise comprehension
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. Will the purely national rejection reasons, as stated in the relevant notice or in the procurement documents, apply?
c.f. the Tender Documentation. part III, post description
Extended deadline for submitting tenders in the competition.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
On behalf of Loppa municipality, tenderers are invited to a competition for improvements to the port conditions in Øksfjord. The General contract (NS 8406) includes the establishment of two new piers, the establishment of a new pumping station, a sewage pipeline and an access road. Dredging the seabed under Molo South is necessary to ensure sufficient geotechnical stability before completion. Dredging masses shall be reused as core masses in the piers and for filling ditches, while any surplus matter is delivered to an approved site. The work shall be carried out with environmental measures such as bubble curtain and turbidity monitoring. The existing sewage pipeline must have been moved and relaid with a new pumping station before sea work starts. The pier North shall be partially established before dredging starts to enable encapsulation of the dredging masses and reduce particle dispersion. The contract includes further filling work, width expansion and extension of Pier North, establishment of a turnaround, as well as concrete work on a new and existing pier. The concrete works are options and include casting breakwater covers, parapets and casting on existing constructions. The builder is free to order all or parts of the optioned concrete works. The execution shall be carried out in accordance with the engineering design documentation and the accompanying drawings. Furthermore, there are option posts for the demolition and re-establishment of approx. 200 metres of existing sewage pipeline on land.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
The price (weighting 70%) shall be in the completed tender form. Price means all works and options included in the tender form, excluding VAT. Any reservations and/or deviations will be described in the tender letter with the stated price consequences.
The competition will be carried out in accordance with the procedure for procurements above the EEA thresholds, cf. FOA part III,
Loppa kommune
Extended deadline for submitting tenders to the competition.
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Price
Weighted 15%. Tenderers shall have a project organisation with key personnel who are well suited for this assignment. An organisation plan for the assignment shall be enclosed with the tender. CVs for key persons who will be used in the assignment shall be enclosed with the tender. At least CVs shall be submitted for the project manager and site manager. This shall show education and project experience (size of the individual assignments, duration as well as the function the person in question has had in these).
WSP NORGE AS (Oppdragsgiver)
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
KOFA
Weighted 15%. Tenderers shall, through assignment comprehension, demonstrate that they are well suited to carry out this assignment. The assignment comprehension shall be enclosed with the tender as includes an account of how the assignment is intended to be solved, progress and how environmental considerations are planned to be taken care of.
The competition is updated with an extended tender deadline. The deadline for receipt of tenders is now 09 ••• ••• 12:00). The deadline for submitting questions is 02.11.26, 12:00. The schedule sketched in part 1 under chapter 1.9 can, therefore, be moved as a result.
01 ••• ••• 52
exg-mis-sanction
allowed
none
60798658-3b20-4627-b2ef-2da9d764d637
exg-mis-prep-confl
required
exg-mis-distortion
exg-sitn-other
Øksfjord
[telefon eliminat]:00:00+00:00
18e74f1a-b4da-42fa-9a37-06a17f07910d
exg-sitn-as-susp
15
16
881894742
15:00:00+00:00
quality
Tromsø
32014L0024
exg-mis-bre-soc-law
3
204/2026
fix-tot
epo-acc-espd-request
2026-11-09+00:00
Fred. Olsens gate 1
exg-crim-fraud
Parkveien 1/3
non-restricted-document
Oddleiv Johnsen
OSLO
45233300
works
2026-10-21+02:00 ••• ••• 02+00:00
2026-10-20Z
0152
eforms-sdk-1.14
body-pl-la
exg-sitn-insolvency
http://www.wsp.com/nb-no
exg-mis-partic-confl
PROCEDURE
exg-mis-bre-lab-law
291114734
2.3
46895764
econ-aff
open
https://permalink.mercell.com/291114734.aspx
231a539e-a279-4869-aa0e-93e23decac06-01
exg-crim-part
Knut Christian Michelsen
452[telefon eliminat]
NO0A2
ORG-[telefon eliminat]
cn-standard
ORG-[telefon eliminat]
ORG-0002
exg-natl-bre-nat-law
exg-crim-traffick
16:35:58+00:00
NO081
exg-sitn-bankr
exg-crim-terror
2026-12-18Z
NOK
9550
epo-notice
4524[telefon eliminat]
no-eu-funds
NOR
exg-pmt-bre-tax
true
45231300
ENG
no
NO073
90546784
Anskaffelsesforskriften
45[telefon eliminat]
not-allowed
45243300
exg-mis-misrepresent
45112310
LOT-0000
[email eliminat]
exg-sitn-liq-admin
update-add
exg-mis-misconduct
70
16:35:42+00:00
exg-mis-bre-env-law
2027-11-05Z
2026-10-19+00:00
cost
Bergen
false
exg-pmt-bre-ssc
[email eliminat]
95[telefon eliminat]
exg-crim-laund
exg-sitn-cred-arran
45252124
exg-crim-corrpt
Loturi TED
1
269550
Loppa municipality - Molo - Øksfjord Harbour
95.000.000,00 NOK
până la 9 nov. 2026, 12:00
On behalf of Loppa municipality, tenderers are invited to a competition for improvements to the port conditions in Øksfjord. The General contract (NS 8406) includes the establishment of two new piers, the establishment of a new pumping station, a sewage pipeline and an access road. Dredging the seabed under Molo South is necessary to ensure sufficient geotechnical stability before completion. Dredging masses shall be reused as core masses in the piers and for filling ditches, while any surplus matter is delivered to an approved site. The work shall be carried out with environmental measures such as bubble curtain and turbidity monitoring. The existing sewage pipeline must have been moved and relaid with a new pumping station before sea work starts. The pier North shall be partially established before dredging starts to enable encapsulation of the dredging masses and reduce particle dispersion. The contract includes further filling work, width expansion and extension of Pier North, establishment of a turnaround, as well as concrete work on a new and existing pier. The concrete works are options and include casting breakwater covers, parapets and casting on existing constructions. The builder is free to order all or parts of the optioned concrete works. The execution shall be carried out in accordance with the engineering design documentation and the accompanying drawings. Furthermore, there are option posts for the demolition and re-establishment of approx. 200 metres of existing sewage pipeline on land.
45200000 — Lucrari de constructii complete sau partiale si lucrari publice
Detalii licitație
Descriere
On behalf of Loppa municipality, tenderers are invited to a competition for improvements to the port conditions in Øksfjord. The General contract (NS 8406) includes the establishment of two new piers, the establishment of a new pumping station, a sewage pipeline and an access road. Dredging the seabed under Molo South is necessary to ensure sufficient geotechnical stability before completion. Dredging masses shall be reused as core masses in the piers and for filling ditches, while any surplus matter is delivered to an approved site. The work shall be carried out with environmental measures such as bubble curtain and turbidity monitoring. The existing sewage pipeline must have been moved and relaid with a new pumping station before sea work starts. The pier North shall be partially established before dredging starts to enable encapsulation of the dredging masses and reduce particle dispersion. The contract includes further filling work, width expansion and extension of Pier North, establishment of a turnaround, as well as concrete work on a new and existing pier. The concrete works are options and include casting breakwater covers, parapets and casting on existing constructions. The builder is free to order all or parts of the optioned concrete works. The execution shall be carried out in accordance with the engineering design documentation and the accompanying drawings. Furthermore, there are option posts for the demolition and re-establishment of approx. 200 metres of existing sewage pipeline on land.
Căutări relevante pentru 729386-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
The contractor ́s collateral shall be established and approved by the project manager before payment of 1st instalment. Building form 8406 B is used as the form for guarantee declaration.
Guarantee required LOT
true
Identifier LOT
LOT-0000
Option description LOT
c.f. the Tender Documentation. part III, post description