ActivăTED — Licitații europene32320000 — Echipament audiovizual si de televiziune·733765-2026
Norvegia – Echipament audiovizual şi de televiziune – Inspisient system for DNS ́s modernisation project.
AS Den Nationale SceneBergen, NO0A2 · NorvegiaTermen limită: 25 nov. 2026, 13:003z 20h 34m 11s rămase
Anunțul 733765-2026 pentru Norvegia – Echipament audiovizual şi de televiziune – Inspisient system for DNS ́s modernisation project. este publicat de AS Den Nationale Scene și este încadrat la codul CPV 32320000.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
Climate and environmental considerations in the procurement, cf. the Public Procurement Regulations § 5b The procurement concerns an inspisient system that mainly consists of electronic equipment, technical components and software. The contracting authority estimates that long lifetime, repairability and reduced need for replacing equipment are the most important measures for limiting the environmental impact of the procurement. A market dialogue has been carried out with several relevant tenderers. The dialogue shows that the tenderers offer relatively comparable solutions, with limited differences in energy consumption and the components' environmental properties. At the same time, the dialogue shows that the market can deliver systems that fulfil the requirements for long technical lifetime, repairability and long-term maintenance. The contracting authority has therefore chosen to set seven obligatory climate and environmental requirements that, among other things, ensure a minimum of 10 years expected technical lifetime, repairability and access to spare parts, long-term software support, energy efficient operation, remote support and a minimum of five years guarantee. A service and maintenance contract shall also be signed for 5 years, with further options for an extension. The contract includes one planned physical service visit per annum, whilst other follow-up as far as possible shall occur via remote support in order to limit the transport need. The contracting authority considers that obligatory requirements for long lifetime, repairability and maintenance give a better environmental effect than using these conditions as award criteria. The requirements ensure that all offered systems fulfil a high minimum level, rather than a shorter lifetime or a smaller degree of repairability can be compensated through a lower price. At the same time, the market dialogue suggests that the potential for further environmental gains through point setting differences between the systems is limited. Combined requirements are expected to reduce resource consumption, electronic waste and transport needs throughout the system's lifetime. The contracting authority considers, on this basis, that the climate and environmental requirements in the requirement specifications provide a better environmental effect than the use of climate and environmental considerations as the award criteria, cf. the Public Procurement Regulations § 5b.
Climate and environmental considerations in the procurement, cf. the Public Procurement Regulations § 5b The procurement concerns an inspisient system that mainly consists of electronic equipment, technical components and software. The contracting authority estimates that long lifetime, repairability and reduced need for replacing equipment are the most important measures for limiting the environmental impact of the procurement. A market dialogue has been carried out with several relevant tenderers. The dialogue shows that the tenderers offer relatively comparable solutions, with limited differences in energy consumption and the components' environmental properties. At the same time, the dialogue shows that the market can deliver systems that fulfil the requirements for long technical lifetime, repairability and long-term maintenance. The contracting authority has therefore chosen to set seven obligatory climate and environmental requirements that, among other things, ensure a minimum of 10 years expected technical lifetime, repairability and access to spare parts, long-term software support, energy efficient operation, remote support and a minimum of five years guarantee. A service and maintenance contract shall also be signed for 5 years, with further options for an extension. The contract includes one planned physical service visit per annum, whilst other follow-up as far as possible shall occur via remote support in order to limit the transport need. The contracting authority considers that obligatory requirements for long lifetime, repairability and maintenance give a better environmental effect than using these conditions as award criteria. The requirements ensure that all offered systems fulfil a high minimum level, rather than a shorter lifetime or a smaller degree of repairability can be compensated through a lower price. At the same time, the market dialogue suggests that the potential for further environmental gains through point setting differences between the systems is limited. Combined requirements are expected to reduce resource consumption, electronic waste and transport needs throughout the system's lifetime. The contracting authority considers, on this basis, that the climate and environmental requirements in the requirement specifications provide a better environmental effect than the use of climate and environmental considerations as the award criteria, cf. the Public Procurement Regulations § 5b.
Loc de executare9
Place of performance
NO0A2 | NOR
Place of performance city LOT
Bergen
Place of performance city PROC
Bergen
Place of performance country LOT
NOR
Place of performance country PROC
NOR
Place of performance post code LOT
5011
Place of performance post code PROC
5011
Place of performance subdiv LOT
NO0A2
Place of performance subdiv PROC
NO0A2
Rezultate, atribuiri și contracte10
Award criterion description LOT
Price The evaluation price consists of the sum of the requested system/sub-system, including all costs associated with the procurement and a 5 year service contract. The system/subsystem for evaluation consists of • Inspisient system (general) • Regikommuikasjon • Hearing • Inspection • Infrastructure • Text monitors The evaluation price does not include an option for a CUE system. See Annex 2 Price Form for an overview of the cost elements included in the evaluation price. Documentation: Complete annex 2 Price Form. The document contains a total of 9 tabs, one for each system/sub-system and an option, service agreement, as well as a sheet for summary (sum) of all prices, where the evaluation price is given.
Award criterion name LOT
Price
Award criterion number LOT
25 | 50 | 15 | 10
Award criterion number weight LOT
per-exa
Award criterion type LOT
price | quality
Contract duration period LOT
18
Contract duration start date LOT
Termene și durate3
Deadline receipt request
2026-11-25T11:00:00Z
Duration period unit LOT
MONTH
Duration period value LOT
18
Valori2
Total value
14000000
Total value CUR
NOK
Autoritate contractantă5
Authority main activity
rcr
Buyer identifier
811167452
Buyer legal type
pub-undert-cga
Buyer post code
5011
Main activity
rcr
Procedură și anunț4
Legal basis
32014L0024
Legal basis NOTICE
32014L0024
Procedure identifier
f516b4cf-e466-48f5-a36a-9a7cdcf6f786
Procedure type
open
Clasificare CPV2
Main classification type LOT
cpv
Main classification type PROC
cpv
Căi de atac1
Review deadline description LOT
Ten Days
Date de contact publicate în TED
9
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42)
Hordaland tingrett
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision.
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Offered Core Team
Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award?
The contracting authority would like a system that is suitable for intended use and that gives a real excess value, at the same time that the system is within the budgetary frameworks. An assessment will be made of the elements below. The various elements are weighted equal to: 1. Technical and functional quality as regards performance and suitability (product data sheet, possibly a description in the solution proposal). 2. Integration and interface (system form, description in the solution proposal). 3. Robustness and operational reliability of the components (described in the solution proposal). 4. User friendliness and system operations (described in the solution proposal, possibly with examples, sketch of inspisientpult etc.). 5. Design/visual expression, possibility for adaptation to existing buildings (product data sheet and description in solution proposal, example pictures). 6. Degree of scalability and flexibility for different sub-systems as regards future changes/expansions (described in the solution proposal). Documentation: The different elements included in the award criteria are documented by the following documentation: • Product data sheet for all products specified in the price form (all sheets). • System form (for individual systems and combined), with the development of how the systems communicate • The tenderer ́s own solution proposal, including any illustrations, examples, sketches, pictures etc. NB! The solution proposal must be structured in accordance with the six factors included in the award criteria, so that it is clear what is being answered. See also detailed requirements for the type of documentation in the italics behind each moment.
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
The team must have a minimum of three, and a maximum of four different resources, with a resource having several roles. This team shall be responsible for the delivery. The team shall cover the following roles: • Project manager (responsible for the engineering design services and any coordination of sub-suppliers) • Programmer • Construction manager, who shall be present daily when there is activity on the building. • Responsible installer The contract will i.a. be evaluated on the following: • Scope of relevant experience in requested roles from the delivery of equivalent systems. Equivalent solutions means the delivery of several of the requested sub-systems/product groups included in this delivery. This factor is somewhat more significant. • How available competence and experience is used to carry out relevant assignments in a way that contributes to high quality in the project implementation. • It is an advantage if the project manager and programmer have good product knowledge. • Measures that ensure progress and quality, in case of any illness and absence from the core team (brief description). • It is an advantage if resources in the core team have experience from work in listed/listed buildings. Only experience for the up to 4 resources included in the four requested roles will be weighted in the evaluation. An overall assessment of the factors above will be made. Documentation: The tenderer ́s own description of the offered core team, of up to 3 A4 pages, font strips. minimum 10. The description must as a minimum contain • the names of offered resources in different roles • Description of relevant experience from equivalent deliveries, including a description of the named project where the resources have contributed, description of the resource's role and work performed in the project. • A description of how the different resources shall be used for various relevant assignments. • any extent of experience from listed/listed buildings, with examples.
Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition?
Implementation plan
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in?
The contracting authority ́s objective with this procurement is to enter into a contract for the delivery of an inspisient system, which shall function as the general management and automation system for the inspisient functions. The procurement also includes the accompanying systems for directing communication, accessories, inspections, CUE lighting, infrastructure and text monitors. Parts of the deliveries are separated as options, for i.a. for budgetary reasons. Which options will be released will primarily be clarified during the detailed engineering design phase. The last deadline for triggering options for equipment is the date of hand-over of the facility. See Annex 3 Price Form for an overview of what are the options. The system shall give the inspisient and technical personnel a common tool for management, monitoring and coordination of production related functions. The system is intended as an operational interface between people and technical systems and it shall not replace dedicated sound, lighting, video or technical stage control systems.
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Odin Prosjekt AS
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.
The agreement has a service agreement for 5 years, with an option for an extension. Parts of the requested goods are included as options, which will be taken up if there are funds. See Annex 2 Price Form, for which products are options.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15).
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1).
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48).
Quality of the offered system
Ten Days
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Price
An overall assessment will be made of the elements below: • Milestone plan, with central challenges and dependencies • Involvement of users (DNS) in the detailed engineering design phase. • How adaptations of the user interface will be facilitated in the completion phase and the trial operation period. NB! Any measures must be binding and included in the price items in Annex 3 in order to get paid. Documentation: The tenderer's own description, including any milestone chart. Maximum 2 A4 pages, font strips. minimum 10, in addition to any schematic presentation of the milestone plan.
Climate and environmental considerations in the procurement, cf. the Public Procurement Regulations § 5b The procurement concerns an inspisient system that mainly consists of electronic equipment, technical components and software. The contracting authority estimates that long lifetime, repairability and reduced need for replacing equipment are the most important measures for limiting the environmental impact of the procurement. A market dialogue has been carried out with several relevant tenderers. The dialogue shows that the tenderers offer relatively comparable solutions, with limited differences in energy consumption and the components' environmental properties. At the same time, the dialogue shows that the market can deliver systems that fulfil the requirements for long technical lifetime, repairability and long-term maintenance. The contracting authority has therefore chosen to set seven obligatory climate and environmental requirements that, among other things, ensure a minimum of 10 years expected technical lifetime, repairability and access to spare parts, long-term software support, energy efficient operation, remote support and a minimum of five years guarantee. A service and maintenance contract shall also be signed for 5 years, with further options for an extension. The contract includes one planned physical service visit per annum, whilst other follow-up as far as possible shall occur via remote support in order to limit the transport need. The contracting authority considers that obligatory requirements for long lifetime, repairability and maintenance give a better environmental effect than using these conditions as award criteria. The requirements ensure that all offered systems fulfil a high minimum level, rather than a shorter lifetime or a smaller degree of repairability can be compensated through a lower price. At the same time, the market dialogue suggests that the potential for further environmental gains through point setting differences between the systems is limited. Combined requirements are expected to reduce resource consumption, electronic waste and transport needs throughout the system's lifetime. The contracting authority considers, on this basis, that the climate and environmental requirements in the requirement specifications provide a better environmental effect than the use of climate and environmental considerations as the award criteria, cf. the Public Procurement Regulations § 5b.
AS Den Nationale Scene
Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU.
Inspisient system for DNS ́s modernisation project.
Price The evaluation price consists of the sum of the requested system/sub-system, including all costs associated with the procurement and a 5 year service contract. The system/subsystem for evaluation consists of • Inspisient system (general) • Regikommuikasjon • Hearing • Inspection • Infrastructure • Text monitors The evaluation price does not include an option for a CUE system. See Annex 2 Price Form for an overview of the cost elements included in the evaluation price. Documentation: Complete annex 2 Price Form. The document contains a total of 9 tabs, one for each system/sub-system and an option, service agreement, as well as a sheet for summary (sum) of all prices, where the evaluation price is given.
206/2026
01
exg-mis-sanction
2026-10-23+02:00
513[telefon eliminat]
none
Anskaffelsesdokumenter
exg-mis-prep-confl
required
exg-mis-distortion
exg-sitn-other
supplies
price
10
11:00:00+00:00
exg-sitn-as-susp
15
16
18
[email eliminat]
[telefon eliminat]
quality
32014L0024
per-exa
exg-mis-bre-soc-law
3
0bad4f73-f0db-4b70-adf1-879f8b584a94
exg-crim-fraud
non-restricted-document
45212322
25
22:01:05+00:00
eforms-sdk-1.14
exg-sitn-insolvency
32320000
Gry Loftesnes
2026-11-25+00:00
rcr
exg-mis-partic-confl
14000000
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=462345&TID=200422646&B=
5059
32[telefon eliminat]
f516b4cf-e466-48f5-a36a-9a7cdcf6f786
exg-mis-bre-lab-law
2.3
open
pub-undert-cga
exg-crim-part
NO0A2
935364906
ORG-[telefon eliminat]+00:00
cn-standard
50
https://odinprosjekt.no
ORG-0001
ORG-0002
exg-crim-traffick
exg-sitn-bankr
exg-crim-terror
NOK
[telefon eliminat]
epo-notice
no-eu-funds
NOR
exg-pmt-bre-tax
31700000
true
2027-04-01Z
32200000
ENG
32330000
no
32500000
21:16:05+00:00 ••• ••• 80
not-allowed
3234[telefon eliminat]
exg-mis-misrepresent
32400000
LOT-[telefon eliminat]
exg-sitn-liq-admin
exg-mis-misconduct
exg-mis-bre-env-law
epo-procurement-document
[email eliminat]
5011
811167452
5012
Bergen
92000000
exg-pmt-bre-ssc
false
32360000
Fabrikkgaten 6
exg-crim-laund
exg-sitn-cred-arran
BERGEN
exg-crim-corrpt
32420000
Loturi TED
1
27005
Inspisient system for DNS ́s modernisation project.
14.000.000,00 NOK
până la 25 nov. 2026, 12:00
The contracting authority ́s objective with this procurement is to enter into a contract for the delivery of an inspisient system, which shall function as the general management and automation system for the inspisient functions. The procurement also includes the accompanying systems for directing communication, accessories, inspections, CUE lighting, infrastructure and text monitors. Parts of the deliveries are separated as options, for i.a. for budgetary reasons. Which options will be released will primarily be clarified during the detailed engineering design phase. The last deadline for triggering options for equipment is the date of hand-over of the facility. See Annex 3 Price Form for an overview of what are the options. The system shall give the inspisient and technical personnel a common tool for management, monitoring and coordination of production related functions. The system is intended as an operational interface between people and technical systems and it shall not replace dedicated sound, lighting, video or technical stage control systems.
32320000 — Echipament audiovizual si de televiziune
Durată: 18 MONTH
Detalii licitație
Descriere
The contracting authority ́s objective with this procurement is to enter into a contract for the delivery of an inspisient system, which shall function as the general management and automation system for the inspisient functions. The procurement also includes the accompanying systems for directing communication, accessories, inspections, CUE lighting, infrastructure and text monitors. Parts of the deliveries are separated as options, for i.a. for budgetary reasons. Which options will be released will primarily be clarified during the detailed engineering design phase. The last deadline for triggering options for equipment is the date of hand-over of the facility. See Annex 3 Price Form for an overview of what are the options. The system shall give the inspisient and technical personnel a common tool for management, monitoring and coordination of production related functions. The system is intended as an operational interface between people and technical systems and it shall not replace dedicated sound, lighting, video or technical stage control systems.
Căutări relevante pentru 733765-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
The agreement has a service agreement for 5 years, with an option for an extension. Parts of the requested goods are included as options, which will be taken up if there are funds. See Annex 2 Price Form, for which products are options.
Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier.