Vardø Fishing Harbour is the largest fishing harbour in the Municipality of Vardø and an important base for the fishing fleet operating in Eastern Finnmark. The harbour is exposed to significant wave action from the northwest through northeast sectors, resulting in challenging berthing conditions, an increased risk of damage to vessels and port infrastructure, and constraints on the efficient utilisation of the harbour facilities. The project comprises the construction of a new outer breakwater north of the entrance to Vardø Harbour, together with dredging and deepening works at Hasselneset to maintain satisfactory navigational access after the harbour entrance is narrowed by the new breakwater. The breakwater will have a total length of approximately 660 metres and will be constructed in water depths of up to 35 metres. The deepening works at Hasselneset include both dredging of unconsolidated seabed materials and underwater rock blasting, with a total excavation volume of approximately 45,000 m³. Material excavated during the deepening works will be reused in the breakwater construction. A substantial portion of the works will be carried out from the sea using a temporary offshore construction platform. All imported rock material required for the breakwater construction will be transported by sea. The project therefore relies heavily on marine logistics, specialised marine equipment, and construction operations under demanding weather and wave conditions. The project is subject to extensive environmental requirements and a number of regulatory approvals, including permits related to marine construction activities, dredging, underwater blasting, environmental monitoring, and plastic waste accounting and reporting. In addition, seasonal restrictions apply to certain construction activities. The primary objective of the project is to improve shelter, safety, and operational conditions within Vardø Fishing Harbour, facilitate efficient and reliable harbour operations, and support the continued development of fisheries and other maritime industries in the region.
Price weighted 100%. The contract will be awarded the tender with the lowest price.
Award criterion name LOT
Lowest price
Award criterion type LOT
price
Contract duration end date LOT
2031-06-20Z
Contract duration start date LOT
2027-06-21Z
Contract nature
works
Contract nature main LOT
works
Contract nature main PROC
works
Autoritate contractantă6
Authority main activity
gen-pub
Buyer identifier
874783242
Buyer internet address
http://www.kystverket.no
Buyer legal type
body-pl-cga
Buyer post code
6025
Main activity
gen-pub
Clasificare CPV2
Main classification type LOT
cpv
Main classification type PROC
cpv
Date de contact publicate în TED
13
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
Is the economic operator aware of having breached obligations relating to labour law or working conditions, as established by national legislation, the relevant contract notice, the procurement documents, or Article 18(2) of Directive 2014/24/EU?
Has the economic operator itself, or any person who is a member of its administrative, management or supervisory body, or who has powers of representation, decision-making or control within the organisation, been convicted by a final judgment of participation in a criminal organisation within the last five years, or within a longer exclusion period specified directly in the judgment and still applicable? Participation in a criminal organisation as defined in Article 2 of Council Framework Decision 2008/841/JHA of 24 October 2008 on the fight against organised crime (OJ L 300, 11.11.2008, p. 42). This ground for exclusion also includes participation in a criminal organisation as defined under the applicable national legislation.
Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition?
Lowest price
Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Has the economic operator itself, or any person who is a member of its administrative, management or supervisory body, or who has powers of representation, decision-making or control within the organisation, been convicted by a final judgment of corruption within the last five years, or within a longer exclusion period specified directly in the judgment and still applicable? Corruption as defined in Article 3 of the Convention on the Fight against Corruption involving Officials of the European Communities or Officials of Member States of the European Union (OJ C 195, 25.6.1997, p. 1), and in Article 2(1) of Council Framework Decision 2003/568/JHA of 22 July 2003 on combating corruption in the private sector (OJ L 192, 31.7.2003, p. 54). This ground for exclusion also covers corruption as defined under the national law applicable to the contracting authority or the economic operator.
Klagenemnda for offentlige anskaffelser
Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in?
Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Has the economic operator itself, or any person who is a member of its administrative, management or supervisory body, or who has powers of representation, decision-making or control within the organisation, been convicted by a final judgment of child labour or human trafficking within the last five years, or within a longer exclusion period specified directly in the judgment and still applicable? Child labour and other forms of human trafficking as defined in Article 2 of Directive 2011/36/EU of the European Parliament and of the Council of 5 April 2011 on preventing and combating trafficking in human beings and protecting its victims, and replacing Council Framework Decision 2002/629/JHA (OJ L 101, 15.4.2011, p. 1). This ground for exclusion also includes offences relating to child labour and human trafficking as defined under the applicable national legislation.
Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents?
Has the economic operator: a) provided materially false or misleading information in connection with the verification of the absence of grounds for exclusion or the fulfilment of the selection criteria; b) failed to provide such information; c) been unable to submit, without undue delay, the supporting documents required by the contracting authority; or d) improperly influenced the decision-making process of the contracting authority in order to obtain confidential information that may provide an undue advantage in the procurement procedure, or negligently provided misleading information that may have a material influence on decisions concerning exclusion, selection, or contract award?
Has the economic operator failed to fulfil its obligations relating to the payment of social security contributions, both in the country in which it is established and in the Member State of the contracting authority, if different from the country of establishment?
Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions?
Vardø Fishing Harbour is the largest fishing harbour in the Municipality of Vardø and an important base for the fishing fleet operating in Eastern Finnmark. The harbour is exposed to significant wave action from the northwest through northeast sectors, resulting in challenging berthing conditions, an increased risk of damage to vessels and port infrastructure, and constraints on the efficient utilisation of the harbour facilities. The project comprises the construction of a new outer breakwater north of the entrance to Vardø Harbour, together with dredging and deepening works at Hasselneset to maintain satisfactory navigational access after the harbour entrance is narrowed by the new breakwater. The breakwater will have a total length of approximately 660 metres and will be constructed in water depths of up to 35 metres. The deepening works at Hasselneset include both dredging of unconsolidated seabed materials and underwater rock blasting, with a total excavation volume of approximately 45,000 m³. Material excavated during the deepening works will be reused in the breakwater construction. A substantial portion of the works will be carried out from the sea using a temporary offshore construction platform. All imported rock material required for the breakwater construction will be transported by sea. The project therefore relies heavily on marine logistics, specialised marine equipment, and construction operations under demanding weather and wave conditions. The project is subject to extensive environmental requirements and a number of regulatory approvals, including permits related to marine construction activities, dredging, underwater blasting, environmental monitoring, and plastic waste accounting and reporting. In addition, seasonal restrictions apply to certain construction activities. The primary objective of the project is to improve shelter, safety, and operational conditions within Vardø Fishing Harbour, facilitate efficient and reliable harbour operations, and support the continued development of fisheries and other maritime industries in the region.
Has the economic operator itself, or any person who is a member of its administrative, management or supervisory body, or who has powers of representation, decision-making or control within the organisation, been convicted by a final judgment of terrorist offences or offences linked to terrorist activities within the last five years, or within a longer exclusion period specified directly in the judgment and still applicable? Terrorist offences or offences linked to terrorist activities as defined in Articles 1 and 3 of Council Framework Decision 2002/475/JHA of 13 June 2002 on combating terrorism (OJ L 164, 22.6.2002, p. 3). This ground for exclusion also covers inciting, aiding, abetting or attempting to commit such offences, as referred to in Article 4 of the aforementioned Framework Decision.
Has the economic operator entered into agreements with other economic operators with the aim of distorting competition?
Price weighted 100%. The contract will be awarded the tender with the lowest price.
Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.
Procurement over the EEA threshold.
Has the economic operator itself, or any person who is a member of its administrative, management or supervisory body, or who has powers of representation, decision-making or control within the organisation, been convicted by a final judgment of money laundering or terrorist financing within the last five years, or within a longer exclusion period specified directly in the judgment and still applicable? Money laundering or terrorist financing as defined in Article 1 of Directive 2005/60/EC of the European Parliament and of the Council of 26 October 2005 on the prevention of the use of the financial system for the purpose of money laundering and terrorist financing (OJ L 309, 25.11.2005, p. 15). This ground for exclusion also includes money laundering or terrorist financing as defined under the applicable national legislation.
The Norwegian Coastal Administration (NCA) is a government agency under the Ministry of Trade, Industry and Fisheries. The agency is responsible for ensuring safe and efficient maritime traffic along the Norwegian coast and into ports, and for maintaining the national preparedness and response system for acute pollution incidents. The NCA is responsible for the safety and navigability of Norway’s coastal waters. Its responsibilities include navigation infrastructure, state-owned fishing harbour facilities, fairway development measures, pilotage services, and vessel traffic services (VTS). The NCA is also responsible for Norway’s national emergency preparedness and response to acute pollution incidents. In addition, the NCA participates in planning processes and exercises regulatory authority under the Ports and Fairways Act, parts of the Pollution Control Act, the Svalbard Environmental Protection Act, and the Planning and Building Act. The agency also contributes to the preparation of the National Transport Plan, which is presented every four years and covers all four transport sectors: road, rail, air, and maritime transport. The NCA is organised into four business areas: Ports, Fairways and Coastal Transport Navigation Technology and Maritime Services Emergency Response to Acute Pollution Pilotage Services Vardø Fishing Harbour is the largest fishing harbour in the Municipality of Vardø and an important base for the fishing fleet operating in Eastern Finnmark. The harbour is exposed to significant wave action from the northwest through northeast sectors, resulting in challenging berthing conditions, an increased risk of damage to vessels and infrastructure, and limitations on the efficient use of the harbour facilities. The project comprises the construction of a new outer breakwater north of the entrance to Vardø Harbour, together with dredging and deepening works at Hasselneset to maintain adequate navigational access after the harbour entrance is narrowed by the new breakwater. The breakwater will have a total length of approximately 660 metres and will be constructed in water depths of up to 35 metres. The deepening works at Hasselneset include both dredging of unconsolidated seabed sediments and underwater rock blasting, with a total excavation volume of approximately 45,000 m³. Material excavated during the deepening works will be reused in the breakwater construction where feasible. A substantial portion of the works will be carried out from the sea using a temporary offshore construction platform. All imported rock material for the breakwater construction will be transported by sea. The project therefore relies heavily on marine-based logistics, specialised marine equipment, and execution under demanding weather and wave conditions. The project is subject to extensive environmental requirements and numerous regulatory permits, including those relating to marine construction activities, dredging, underwater blasting, environmental monitoring, and plastic waste management. In addition, seasonal restrictions apply to certain construction activities. The primary objective of the project is to improve shelter and operational safety within Vardø Fishing Harbour, facilitate efficient and reliable harbour operations, and support the continued development of fisheries and other maritime industries in the region.
KYSTVERKET
Has the economic operator itself, or any person who is a member of its administrative, management or supervisory body, or who has powers of representation, decision-making or control within the organisation, been convicted by a final judgment of fraud within the last five years, or within a longer exclusion period specified directly in the judgment and still applicable? Fraud as referred to in Article 1 of the Convention on the Protection of the European Communities’ Financial Interests (OJ C 316, 27.11.1995, p. 48). This ground for exclusion includes fraud as defined in the above Convention and in the applicable national legislation.
Vardø fishing port - outer pier
Is the economic operator aware of having breached obligations relating to environmental law, as established by national legislation, the relevant contract notice, the procurement documents, or Article 18(2) of Directive 2014/24/EU?
Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents.
Is the economic operator aware of having breached obligations relating to social law, as established by national legislation, the relevant contract notice, the procurement documents, or Article 18(2) of Directive 2014/24/EU?
The contracting authority shall state that, under Norwegian procurement regulations, additional national grounds for exclusion apply. These grounds shall be described in the procurement documents. The economic operator must indicate whether it is in one or more of the situations covered by these national grounds for exclusion. Do any of the national grounds for exclusion set out in the relevant contract notice or procurement documents apply to the economic operator?
01
exg-mis-sanction
exg-crim-part
none
Vardø fiskerihavn
exg-mis-prep-confl
NO0A3
required
NO0A2
2027-05-07+00:00
Postboks 1502
exg-mis-distortion
exg-sitn-other
price
http://www.kystverket.no
[email eliminat]
body-pl-cga
[email eliminat]
cn-standard
ORG-0001
ORG-0002
Postboks 511 sentrum
gen-pub
9950
exg-natl-bre-nat-law
1b76abe7-c7d4-4063-928c-3093b94d9c8c
exg-crim-traffick
2027-06-21Z
exg-sitn-as-susp
16
10:00:00+00:00
exg-sitn-bankr
[telefon eliminat]
exg-crim-terror
285552741
epo-notice
https://permalink.mercell.com/285552741.aspx
45244200
no-eu-funds
NOR
32014L0024
exg-pmt-bre-tax
exg-mis-bre-soc-law
6
true
exg-crim-fraud
non-restricted-document
[telefon eliminat]
ENG
209/2026
no
10:29:06+00:00
works
55193000
NO073
Anskaffelsesforskriften
eforms-sdk-1.13
exg-sitn-insolvency
not-allowed
2026-10-28Z
45243300
exg-mis-misrepresent
epo-sub-espd
45244000
LOT-0000
12:10:56+00:00
e0b434a9-3d23-4207-9082-9ced9208c17f
exg-sitn-liq-admin
exg-mis-misconduct
vardø
ÅLESUND
exg-mis-bre-env-law
epo-procurement-document
918195548
Hallvard Svendsen
2026-10-28+01:00
exg-mis-partic-confl
6025
exg-pmt-bre-ssc
false
45247100
5805
exg-crim-laund
exg-sitn-cred-arran
BERGEN
exg-mis-bre-lab-law
2027-05-21+00:00
874783242
2.3
2026-10-27+00:00
2022/4846
45252124
exg-crim-corrpt
2031-06-20Z
open
Loturi TED
1
2022/4846
Vardø fishing port - outer pier
până la 21 mai 2027, 12:00
The Norwegian Coastal Administration (NCA) is a government agency under the Ministry of Trade, Industry and Fisheries. The agency is responsible for ensuring safe and efficient maritime traffic along the Norwegian coast and into ports, and for maintaining the national preparedness and response system for acute pollution incidents. The NCA is responsible for the safety and navigability of Norway’s coastal waters. Its responsibilities include navigation infrastructure, state-owned fishing harbour facilities, fairway development measures, pilotage services, and vessel traffic services (VTS). The NCA is also responsible for Norway’s national emergency preparedness and response to acute pollution incidents. In addition, the NCA participates in planning processes and exercises regulatory authority under the Ports and Fairways Act, parts of the Pollution Control Act, the Svalbard Environmental Protection Act, and the Planning and Building Act. The agency also contributes to the preparation of the National Transport Plan, which is presented every four years and covers all four transport sectors: road, rail, air, and maritime transport. The NCA is organised into four business areas: Ports, Fairways and Coastal Transport Navigation Technology and Maritime Services Emergency Response to Acute Pollution Pilotage Services Vardø Fishing Harbour is the largest fishing harbour in the Municipality of Vardø and an important base for the fishing fleet operating in Eastern Finnmark. The harbour is exposed to significant wave action from the northwest through northeast sectors, resulting in challenging berthing conditions, an increased risk of damage to vessels and infrastructure, and limitations on the efficient use of the harbour facilities. The project comprises the construction of a new outer breakwater north of the entrance to Vardø Harbour, together with dredging and deepening works at Hasselneset to maintain adequate navigational access after the harbour entrance is narrowed by the new breakwater. The breakwater will have a total length of approximately 660 metres and will be constructed in water depths of up to 35 metres. The deepening works at Hasselneset include both dredging of unconsolidated seabed sediments and underwater rock blasting, with a total excavation volume of approximately 45,000 m³. Material excavated during the deepening works will be reused in the breakwater construction where feasible. A substantial portion of the works will be carried out from the sea using a temporary offshore construction platform. All imported rock material for the breakwater construction will be transported by sea. The project therefore relies heavily on marine-based logistics, specialised marine equipment, and execution under demanding weather and wave conditions. The project is subject to extensive environmental requirements and numerous regulatory permits, including those relating to marine construction activities, dredging, underwater blasting, environmental monitoring, and plastic waste management. In addition, seasonal restrictions apply to certain construction activities. The primary objective of the project is to improve shelter and operational safety within Vardø Fishing Harbour, facilitate efficient and reliable harbour operations, and support the continued development of fisheries and other maritime industries in the region.
45244200 — Jetele
Detalii licitație
Descriere
The Norwegian Coastal Administration (NCA) is a government agency under the Ministry of Trade, Industry and Fisheries. The agency is responsible for ensuring safe and efficient maritime traffic along the Norwegian coast and into ports, and for maintaining the national preparedness and response system for acute pollution incidents. The NCA is responsible for the safety and navigability of Norway’s coastal waters. Its responsibilities include navigation infrastructure, state-owned fishing harbour facilities, fairway development measures, pilotage services, and vessel traffic services (VTS). The NCA is also responsible for Norway’s national emergency preparedness and response to acute pollution incidents. In addition, the NCA participates in planning processes and exercises regulatory authority under the Ports and Fairways Act, parts of the Pollution Control Act, the Svalbard Environmental Protection Act, and the Planning and Building Act. The agency also contributes to the preparation of the National Transport Plan, which is presented every four years and covers all four transport sectors: road, rail, air, and maritime transport. The NCA is organised into four business areas: Ports, Fairways and Coastal Transport Navigation Technology and Maritime Services Emergency Response to Acute Pollution Pilotage Services Vardø Fishing Harbour is the largest fishing harbour in the Municipality of Vardø and an important base for the fishing fleet operating in Eastern Finnmark. The harbour is exposed to significant wave action from the northwest through northeast sectors, resulting in challenging berthing conditions, an increased risk of damage to vessels and infrastructure, and limitations on the efficient use of the harbour facilities. The project comprises the construction of a new outer breakwater north of the entrance to Vardø Harbour, together with dredging and deepening works at Hasselneset to maintain adequate navigational access after the harbour entrance is narrowed by the new breakwater. The breakwater will have a total length of approximately 660 metres and will be constructed in water depths of up to 35 metres. The deepening works at Hasselneset include both dredging of unconsolidated seabed sediments and underwater rock blasting, with a total excavation volume of approximately 45,000 m³. Material excavated during the deepening works will be reused in the breakwater construction where feasible. A substantial portion of the works will be carried out from the sea using a temporary offshore construction platform. All imported rock material for the breakwater construction will be transported by sea. The project therefore relies heavily on marine-based logistics, specialised marine equipment, and execution under demanding weather and wave conditions. The project is subject to extensive environmental requirements and numerous regulatory permits, including those relating to marine construction activities, dredging, underwater blasting, environmental monitoring, and plastic waste management. In addition, seasonal restrictions apply to certain construction activities. The primary objective of the project is to improve shelter and operational safety within Vardø Fishing Harbour, facilitate efficient and reliable harbour operations, and support the continued development of fisheries and other maritime industries in the region.
Căutări relevante pentru 747826-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
Has the economic operator itself, or any person who is a member of its administrative, management or supervisory body, or who has powers of representation, decision-making or control within the organisation, been convicted by a final judgment of corruption within the last five years, or within a longer exclusion period specified directly in the judgment and still applicable? Corruption as defined in Article 3 of the Convention on the Fight against Corruption involving Officials of the European Communities or Officials of Member States of the European Union (OJ C 195, 25.6.1997, p. 1), and in Article 2(1) of Council Framework Decision 2003/568/JHA of 22 July 2003 on combating corruption in the private sector (OJ L 192, 31.7.2003, p. 54). This ground for exclusion also covers corruption as defined under the national law applicable to the contracting authority or the economic operator.