Rezultat publicatTED — Licitații europene45220000 — Lucrari de inginerie si de constructii·759645-2026
Irlanda – Lucrări de inginerie şi de construcţii – DCC Multi Party Framework Agreement for Conservation and Refurbishment Construction Works exceeding €5m ex. VAT with an initial contract for Refurbishment of Former Isolation Hospital Infirmary Road.
Anunțul 759645-2026 pentru Irlanda – Lucrări de inginerie şi de construcţii – DCC Multi Party Framework Agreement for Conservation and Refurbishment Construction Works exceeding €5m ex. VAT with an initial contract for Refurbishment of Former Isolation Hospital Infirmary Road. este publicat de Dublin City Council și este încadrat la codul CPV 45220000.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
Stewart Construction | Kellbuild Ltd | McKeon Contech Ltd t/a McKeon Group and Hereworks | Collen Construction Ltd | Clancy | Purcell Construction Limited | Townlink Construction Ltd
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
DCC Multi Party Framework Agreement for Conservation and Refurbishment Construction Works exceeding €5m ex. VAT with an initial contract for Refurbishment of Former Isolation Hospital Infirmary Road.
Dublin City Council
The High Court of Ireland
Collen Construction Limited
European Dynamics S.A.
Expression of Interest for Multi Party Framework Agreement for Conservation and Refurbishment Works for Dublin City Council for projects with an estimated construction value in excess of €5m ex. VAT with the Refurbishment of the Former Isolation Hospital and Repurposing to Community / Cultural Use as the Initial Project. The period of the Framework Agreement will be 4 years. The overall scope of works to the Isolation Hospital involves the renovation of multiple existing buildings and repurposing for community use. In broad summary the works included in the renovation of each of the existing buildings include: Demolitions and Alterations - stripping out any remaining decayed timber structures, completions, walls, floors, forming new or widening existing openings for new door sets Substructures - new foundations and rising wall for extensions, new suspended timber floor structures to ground floors generally throughout Walls - masonry repairs to internal and external stone and brick walls Roofs - new rafters and purlins to roof structure generally throughout, new steel roof and tower structure to building G2, repairs and replacement to timber trusses as required Completions - repairs and reglazing to existing sliding sash window where possible, new timber windows to match existing where required, new aluminium framed curtain walling and glazed door sets to extensions, new solid core timber panelled door sets internally Finishes - new floor, wall and ceiling finishes throughout, new natural slate finish generally throughout to roof, new lead roll finish to building G2 including tower structure, Fittings; new built in and sanitary fittings throughout Services - mechanical and electrical installations and External Site Works. The duration of the initial contract is 15 months. The period of the framework agreement will be 4 years. URDF Funding of €7.5m granted. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 6364531. The initial contract for refurbishment of the former Isolation Hospital Infirmary has been awarded to Kelbuild.
Kelbuild Ltd
Townlink Construction Ltd
DCC Multi Party Framework Agreement for Conservation and Refurbishment Construction Works exceeding €5m ex. VAT with an initial contract for Refurbishment of Former Isolation Hospital Infirmary Road. The initial contract for refurbishment of the former Isolation Hospital Infirmary has been awarded to Kellbuild.
Expression of Interest for Multi Party Framework Agreement for Conservation and Refurbishment Works for Dublin City Council for projects with an estimated construction value in excess of €5m ex. VAT with the Refurbishment of the Former Isolation Hospital and Repurposing to Community / Cultural Use as the Initial Project. The overall value of the Framework is €80m ex. VAT. The overall scope of works to the Isolation Hospital involves the renovation of multiple existing buildings and repurposing for community use. In broad summary the works included in the renovation of each of the existing buildings include: Demolitions and Alterations - stripping out any remaining decayed timber structures, completions, walls, floors, forming new or widening existing openings for new door sets Substructures - new foundations and rising wall for extensions, new suspended timber floor structures to ground floors generally throughout Walls - masonry repairs to internal and external stone and brick walls Roofs - new rafters and purlins to roof structure generally throughout, new steel roof and tower structure to building G2, repairs and replacement to timber trusses as required Completions - repairs and reglazing to existing sliding sash window where possible, new timber windows to match existing where required, new aluminium framed curtain walling and glazed door sets to extensions, new solid core timber panelled door sets internally Finishes - new floor, wall and ceiling finishes throughout, new natural slate finish generally throughout to roof, new lead roll finish to building G2 including tower structure, Fittings; new built in and sanitary fittings throughout Services - mechanical and electrical installations and External Site Works. The duration of the initial contract is 15 months. The period of the framework agreement will be 4 years. URDF Funding of €7.5m granted. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 6364531. The initial contract for refurbishment of the former Isolation Hospital Infirmary has been awarded to Kelbuild.
Technical Merit @60%
McKeon Contech Ltd. t/a McKeon Group and Hereworks
Cost @40%
Clancy
Purcell Construction Limited
Stewart Construction
01
[telefon eliminat]
b04d3c86-524b-4632-aca0-d98ffc1443f4
43 Lower Salthill
0449345250
0449345251
none
[email eliminat]
IE051
[email eliminat]
[telefon eliminat]
gen-pub
460438
A84 EK54
68368
460437
460436
[telefon eliminat]
CON-0002
CON-0001
[email eliminat]
CON-0004
Ashbourne
2026-10-30+00:00
CON-0003
Athens
quality
32014L0024
0
per-exa
ERDF_2021
CON-0006
CON-0005
IE042
7
CON-0007
can-standard
12:55:28+00:00
398496
[telefon eliminat]
Civic Offices, Wood Quay
IRL
4791881IH
works
29
TEN-0003
TEN-0002
TEN-0001
sme
[telefon eliminat]
eforms-sdk-1.13
TEN-0007
Galway
[telefon eliminat]
TEN-0006
TEN-0005
Four Courts, Inns Quay, Dublin 7
[email eliminat]
RES-0001
TEN-0004
E41H398
Unit 40, Lough Sheever Corporate Park
Unit 7/8, Block 13A,
[telefon eliminat]
www.stewart.ie
15125
[email eliminat]
eu-funds
www.townlink.ie
107247
www.clancy.ie
IE061
[telefon eliminat]+00:00
IE062
01 ••• ••• 22
IE063
la
bd83f0c3-0536-4e06-93f3-851070e9ee95-01
2.3
091524943
000169713
ORG-[telefon eliminat]e1a170-be16-4cc8-8fb4-26867852ca0a
ted-esen
small
EL301
IE47732154U
ORG-0007
48
selec-w
ORG-0008
H91 A6Y7
137786
Kellbuild Ltd
ORG-[telefon eliminat]
Dublin
D08 RF3F
4522[telefon eliminat]
ORG-0003
ORG-0004
ORG-0005
ORG-0006
https://www.dublincity.ie
ORG-0001
ORG-0002
Eastwall
05 ••• ••• 66
EUR
Drangan
[email eliminat]
Collen Construction Ltd
2026-10-29+00:00
[email eliminat]
N91 XVK7
Mullingar
212/2026
true
GRC
60
10 Greenhills Business Park
09 ••• ••• 00
ENG
no
[email eliminat]
460441
460440
medium
D24NX77
[email eliminat]
LOT-0001
[telefon eliminat]
www.purcell.ie
[email eliminat]
09 ••• ••• 55
TPA-0001
TPA-0002
TPA-0003
57 Briarhill Business Park Ballybrit
TPA-0004
TPA-0005
TPA-0006
TPA-0007
Thurles
D07 WDX8
cost
80000000
McKeon Contech Ltd t/a McKeon Group and Hereworks
false
2026-11-02+01:00
fa-w-rc
[telefon eliminat]
D03P7Y5
Urban Regeneration and Development Fund
tenders
restricted
H91N9X0
104723
https://mckeon.ie/
Loturi TED
1
0
DCC Multi Party Framework Agreement for Conservation and Refurbishment Construction Works exceeding €5m ex. VAT with an initial contract for Refurbishment of Former Isolation Hospital Infirmary Road. The initial contract for refurbishment of the former Isolation Hospital Infirmary has been awarded to Kellbuild.
80.000.000,00 EUR
Expression of Interest for Multi Party Framework Agreement for Conservation and Refurbishment Works for Dublin City Council for projects with an estimated construction value in excess of €5m ex. VAT with the Refurbishment of the Former Isolation Hospital and Repurposing to Community / Cultural Use as the Initial Project. The period of the Framework Agreement will be 4 years. The overall scope of works to the Isolation Hospital involves the renovation of multiple existing buildings and repurposing for community use. In broad summary the works included in the renovation of each of the existing buildings include: Demolitions and Alterations - stripping out any remaining decayed timber structures, completions, walls, floors, forming new or widening existing openings for new door sets Substructures - new foundations and rising wall for extensions, new suspended timber floor structures to ground floors generally throughout Walls - masonry repairs to internal and external stone and brick walls Roofs - new rafters and purlins to roof structure generally throughout, new steel roof and tower structure to building G2, repairs and replacement to timber trusses as required Completions - repairs and reglazing to existing sliding sash window where possible, new timber windows to match existing where required, new aluminium framed curtain walling and glazed door sets to extensions, new solid core timber panelled door sets internally Finishes - new floor, wall and ceiling finishes throughout, new natural slate finish generally throughout to roof, new lead roll finish to building G2 including tower structure, Fittings; new built in and sanitary fittings throughout Services - mechanical and electrical installations and External Site Works. The duration of the initial contract is 15 months. The period of the framework agreement will be 4 years. URDF Funding of €7.5m granted. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 6364531. The initial contract for refurbishment of the former Isolation Hospital Infirmary has been awarded to Kelbuild.
45220000 — Lucrari de inginerie si de constructii
Durată: 48 MONTH
Rezultate și atribuiri TED
LOT-0001
Câștigător: Kelbuild Ltd · CUI 104723
Contract 46043620 oct. 2026
LOT-0001
Câștigător: Clancy · CUI 383956
Contract 46044120 oct. 2026
LOT-0001
Câștigător: McKeon Contech Ltd. t/a McKeon Group and Hereworks · CUI 68368
Contract 46044020 oct. 2026
LOT-0001
Câștigător: Collen Construction Limited · CUI 4791881IH
Contract 46043520 oct. 2026
LOT-0001
Câștigător: Purcell Construction Limited · CUI 398496
Contract 46043920 oct. 2026
LOT-0001
Câștigător: Stewart Construction · CUI 137786
Contract 46043820 oct. 2026
LOT-0001
Câștigător: Townlink Construction Ltd · CUI 107247
Contract 46043720 oct. 2026
Detalii licitație
Descriere
Expression of Interest for Multi Party Framework Agreement for Conservation and Refurbishment Works for Dublin City Council for projects with an estimated construction value in excess of €5m ex. VAT with the Refurbishment of the Former Isolation Hospital and Repurposing to Community / Cultural Use as the Initial Project. The overall value of the Framework is €80m ex. VAT. The overall scope of works to the Isolation Hospital involves the renovation of multiple existing buildings and repurposing for community use. In broad summary the works included in the renovation of each of the existing buildings include: Demolitions and Alterations - stripping out any remaining decayed timber structures, completions, walls, floors, forming new or widening existing openings for new door sets Substructures - new foundations and rising wall for extensions, new suspended timber floor structures to ground floors generally throughout Walls - masonry repairs to internal and external stone and brick walls Roofs - new rafters and purlins to roof structure generally throughout, new steel roof and tower structure to building G2, repairs and replacement to timber trusses as required Completions - repairs and reglazing to existing sliding sash window where possible, new timber windows to match existing where required, new aluminium framed curtain walling and glazed door sets to extensions, new solid core timber panelled door sets internally Finishes - new floor, wall and ceiling finishes throughout, new natural slate finish generally throughout to roof, new lead roll finish to building G2 including tower structure, Fittings; new built in and sanitary fittings throughout Services - mechanical and electrical installations and External Site Works. The duration of the initial contract is 15 months. The period of the framework agreement will be 4 years. URDF Funding of €7.5m granted. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 6364531. The initial contract for refurbishment of the former Isolation Hospital Infirmary has been awarded to Kelbuild.
Căutări relevante pentru 759645-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
43 Lower Salthill | Unit 40, Lough Sheever Corporate Park | Unit 7/8, Block 13A, | Drangan | 57 Briarhill Business Park Ballybrit | 10 Greenhills Business Park