ActivăTED — Licitații europene31213200 — Transformatoare de distributie·771645-2026
Ţările de Jos – Transformatoare de distribuţie – Compact stations
N.V. Nederlandse GasunieGroningen, NLD · Țările de JosTermen limită: 20 ian. 2027, 11:0059z 12h 20m 09s rămase
Anunțul 771645-2026 pentru Ţările de Jos – Transformatoare de distribuţie – Compact stations este publicat de N.V. Nederlandse Gasunie și este încadrat la codul CPV 31213200.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
Gasunie has determined that the walkable enclosure will be removed from the scope of the contract. Since this constitutes a material change to the contract, Gasunie has decided to rectify the tender on TenderNed. As a result, the procurement timetable will be amended. The revised timetable is set out in the response to question 71 in the Note of Information.
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
no
The framework agreement has an initial term of four years. The intended effective date of the agreement is mentioned in the planning. The term of the agreement can be extended once by four years. The intended effective date of the frame work agreement is a target date, and no rights can be derived from this date.
In order for Gasunie to achieve the intended result of the contract (see section 2.1.1), you shall be required to perform various activities, also referred to as the ‘contract scope’. These activities are, in general terms, outlined below: • Engineering, manufacturing, assembly, testing (FAT), transportation to Gasunie site and testing on site (SAT) of compact stations. • Each compact station contains: o Concrete housing. o One hermetically sealed oil type 400 kVA 33kV/0,41 kV transformer. o One low voltage distribution board. o One socket outlet rack on the outside of the compact station. See award guideline.
Compact stations
N.A.
The walkable enclosure is no longer part of the scope of the contract. n.a.
-
Gasunie has determined that the walkable enclosure will be removed from the scope of the contract. Since this constitutes a material change to the contract, Gasunie has decided to rectify the tender on TenderNed. As a result, the procurement timetable will be amended. The revised timetable is set out in the response to question 71 in the Note of Information.
no-eu-funds
quality
Rechtbank Noord Nederland Groningen
Price
N.V. Nederlandse Gasunie
Quality
price
In order for Gasunie to achieve the intended result of the contract (see section 2.1.1), you shall be required to perform various activities, also referred to as the ‘contract scope’. These activities are, in general terms, outlined below: • Engineering, manufacturing, assembly, testing (FAT), transportation to Gasunie site and testing on site (SAT) of compact stations. • Each compact station contains: o Concrete housing. o One hermetically sealed oil type 400 kVA 33kV/0,41 kV transformer. o One low voltage distribution board. o One socket outlet rack on the outside of the compact station. • FAT at supplier’s factory. • SAT including testing on site and commissioning support. See award guideline.
See the award guideline.
epo-procurement-document
open
[telefon eliminat]+01:00
14:42:55.443123203+01:00
[telefon eliminat]
allowed
2026-11-06+01:00
https://www.gasunie.nl/leveranciers/werken-met-ariba/toegang-tot-aanbestedingsdocumenten
poi-exa
none
required
TPO-0001
5f6a5005-91f4-4c09-89f4-45ecf1e6f8d0
supplies
http://www.gasunie.nl
cn-standard
pub-undert
anyw-cou
50
ORG-0001
Concourslaan 17
https://www.tenderned.nl/aankondigingen/overzicht/448101
17
42113120
WS3076527929
9700 AT
[email eliminat]
32014L[telefon eliminat]+01:00
1
2
[email eliminat]
3
4
31213200
true
non-restricted-document
ENG
documentsId
9727 KC
10:00:00+01:00
NLD
http://www.rechtspraak.nl
fa-wo-rc
eforms-sdk-1.13
not-allowed
72c9629a-413f-4070-91a4-b93e45a64a3b-01
LOT-0001
Postbus 781
LOT-0002
update-add
gas-heat
Paula Mol
Groningen
216/2026
31200000
not-requ
false
152182772
performance
[telefon eliminat]
NL114
NL115
46c01ab6-8a13-4e7b-9157-0524539e099b
2026-11-05+01:00
Loturi TED
2
1
Compact stations
până la 20 ian. 2027, 10:00
In order for Gasunie to achieve the intended result of the contract (see section 2.1.1), you shall be required to perform various activities, also referred to as the ‘contract scope’. These activities are, in general terms, outlined below: • Engineering, manufacturing, assembly, testing (FAT), transportation to Gasunie site and testing on site (SAT) of compact stations. • Each compact station contains: o Concrete housing. o One hermetically sealed oil type 400 kVA 33kV/0,41 kV transformer. o One low voltage distribution board. o One socket outlet rack on the outside of the compact station. See award guideline.
31213200 — Transformatoare de distributie
Durată: 4 YEAR
2
N.A.
până la 20 ian. 2027, 10:00
The walkable enclosure is no longer part of the scope of the contract. n.a.
42113120 — Carcase
Durată: 4 YEAR
Detalii licitație
Descriere
In order for Gasunie to achieve the intended result of the contract (see section 2.1.1), you shall be required to perform various activities, also referred to as the ‘contract scope’. These activities are, in general terms, outlined below: • Engineering, manufacturing, assembly, testing (FAT), transportation to Gasunie site and testing on site (SAT) of compact stations. • Each compact station contains: o Concrete housing. o One hermetically sealed oil type 400 kVA 33kV/0,41 kV transformer. o One low voltage distribution board. o One socket outlet rack on the outside of the compact station. • FAT at supplier’s factory. • SAT including testing on site and commissioning support. See award guideline.
Căutări relevante pentru 771645-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
The framework agreement has an initial term of four years. The intended effective date of the agreement is mentioned in the planning. The term of the agreement can be extended once by four years. The intended effective date of the frame work agreement is a target date, and no rights can be derived from this date.
Procurement document id LOT
documentsId
Public opening date LOT
2027-01-20+01:00
Public opening time LOT
10:00:00+01:00
Renewal description LOT
The framework agreement has an initial term of four years. The intended effective date of the agreement is mentioned in the planning. The term of the agreement can be extended once by four years. The intended effective date of the frame work agreement is a target date, and no rights can be derived from this date.