Anunțul 555854-2026 pentru Polonia – Diverse utilaje de uz general şi special – CDS Condensate Pumps este publicat de BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ și este încadrat la codul CPV 42900000.
Sinteză HarveyAI
Harvey procesează documentele acestei licitații...
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
Organisation name ted esen
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
Organisation post code buyer
84-210
Organisation post code ted esen
84-210 | 2417
Organisation tel buyer
[telefon eliminat]
Organisation tel ted esen
[telefon eliminat] | [telefon eliminat]
Loturi8
Additional classification LOT
42000000
Additional classification type LOT
cpv
Description LOT
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The package is anticipated to include nine (9) vertical deepwell, multi-stage centrifugal pumps, arranged as three (3) pumps per unit in a 3 × 50% configuration, complete with drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services. The equipment shall be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. Interested suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project.
Electronic submission LOT
allowed
Identifier LOT
LOT-0001
Submission nonelectronic description LOT
Procedură și anunț11
Form type
competition
Legal basis
other
Legal basis no id
LocalLegalBasis
Legal basis no id desc
Other
Legal basis NOTICE
other
NOTICE identifier
4e36c8a8-6eaa-405b-a46c-7058421d4b1b
NOTICE subtype
E3
NOTICE title
Polonia – Diverse utilaje de uz general şi special – CDS Condensate Pumps
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
Buyer post code
84-210
Buyer profile
Clasificare CPV5
Classification cpv
42900000 | 42900000 | 42000000
Main classification LOT
42900000
Main classification PROC
42900000
Main classification type LOT
cpv
Main classification type PROC
cpv
Loc de executare11
Place of performance
PL634 | POL | PL634 | POL
Place of performance add PROC
1. Experienced and qualified Companies are invited to provide a proposal for design and manufacture of CDS Condensate Pumps (Vertical Deepwell, Multi-Stage) in accordance with quality ISO:19001 requirements and European Union and Polish Directives and Regulations including the applicable Codes and Standards for the Poland Nuclear Power Plant. The scope of work shall include design and manufacture of CDS Condensate Pumps (Vertical Deepwell, Multi-Stage) that meet specifications, drawings, and other purchase order requirements. Delivery may be performed by either Bechtel or company, as determined by Bechtel. Interested companies must register/update their Company's information in Bechtel's iSupplier portal at https:// www.bechtel.com/supplier/. If Company has any questions or to express interest in bidding on this requirement, Company shall notify Bechtel’s Contact Person. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire where interested party would complete with response to Bechtel for review. Bechtel notes that previous proven capabilities and experience of similar scale and complexity will be mandatory, and additional documentation / evidence may be required. 2. The prequalification criteria shall be included in the prequalification questionnaire, examples thereof include demonstration of (i) experience in furnishing similar condensate pumps equipment type in past or current projects, (ii) availability of equipment/personnel/facilities for performance of scope, (iii) compliance to ISO 9001:2015 or quality program that is comparable to ISO 9001 (to be approved by Bechtel and PEJ), (iv) compliance to certification of legally mandatory requirements, (v) financial standing (solvency), and (vi) verification of organizational capabilities. Shop visits to perform a supplier survey or audit prior to RFQ issuance may be required. 3.Upon Bechtel’s evaluation of your response to the Poland Prequalification Questionnaire, Bechtel will notify if your Company meets, conditionally meets, or does not meet the prequalification requirements that closely match the requirements. Your Company's submission of the Prequalification Questionnaire does not automatically qualify your Company to be a prequalified Company for the Scope. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: -any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or -economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. 4.Each prequalified Company will be required to execute a Non-Disclosure Agreement (NDA). 5.Companies meeting the prequalification criteria and who have executed the NDA will be invited to submit the proposals for CDS Condensate Pumps (Vertical Deepwell, Multi-Stage). 6.The Request for Quotation (RFQ) shall include the proposal questionnaire(s), scope of work, specifications, drawings, datasheets, terms and conditions, award criteria, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. Supplier User Guides: https://www.bechtel.com/supplier/#registration-Info 7.Proposal may be provided in EURO, PLN, and USD. Furthermore, the proposals will be requested as unit pricing per CDS Condensate Pumps. 8.Award will be made to the responsive and responsible company whose proposal meets the requirements of the RFQ and provides a technically acceptable proposal. Consideration of the following key criteria, together with cost, will determine the final decision for award(s), which will be detailed further in the Bid Document(s) and during the RFQ phase. -Technical Capability -Previous Proven Relevant Experience -Quality -Delivery Management -Schedule The evaluation factors to determine the selected proposal shall be based on the commercial factors that impact overall cost, such as freight, proximity to project site, Carbon Border Adjustment Mechanism (CBAM) requirements, payment terms, performance and payment securities, and insurance. Buyer may divide the award among more than one Supplier if this is in the best interest of Buyer. Supplier must specifically list in their proposal all the country(ies) of origin for each major component. All materials must meet the requirements of the applicable codes and specifications of the RFQ. 9.Any Companies that do not meet the legally mandatory compliance requirement will be excluded. 10.The procedure for the Company to gain access to classified information, as required, will be subject to compliance with the executed NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFQ document. 11.The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
Alte informații publicate18
Additional info PROC
The Company shall certify that (i) is not subject to Sanctions, and (ii) do not present a threat to the security interests of the Poland, in particular that they are not (a) a Russian national, or a natural or legal person, entity or body established in Russia or (b) a legal person, entity or body whose proprietary rights are directly or indirectly owned for more than fifty percent (50%) by an entity referred to in point (a) of this Section or (c) a natural or legal person, entity or body acting on behalf or at the direction of an entity referred to in point (a) or (b) of this Section. The Company shall confirm that all subcontractors of any tier will provide that they are not subject to any criteria mentioned above as a part of the Proposal. The Company shall also confirm that no Iron and Steel products subject to the EU import ban, including those processed from third party, are used in furnishing the requested product. “Sanctions” shall mean measures aimed at maintaining or restoring international peace and security enacted by the United Nations and/or the European Union and/or the Poland and/or the US, or any such sanctions law applicable to the Company or undertaking relating to or in connection with this submittal of Prequalification Questionnaire or undertaking's, such as sectoral measures, economic and financial measures, or measures introduced against countries (embargoes), natural or legal persons or groups or non-state entities (blocking measures). Any Companies that do not meet the legally mandatory compliance requirements, as specified above, will be excluded.
Competition termination PROC
false
Customization id
eforms-sdk-1.14
Description PROC
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The package is anticipated to include nine (9) vertical deepwell, multi-stage centrifugal pumps, arranged as three (3) pumps per unit in a 3 × 50% configuration, complete with drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services. The equipment shall be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. Interested suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project.
Rezultate, atribuiri și contracte3
Contract nature
supplies | supplies
Contract nature main LOT
supplies
Contract nature main PROC
supplies
Date de contact publicate în TED
8
Contactele sunt disponibile utilizatorilor autentificați.Autentifică-te
Textul integral publicat de TEDextinde
1. Experienced and qualified Companies are invited to provide a proposal for design and manufacture of CDS Condensate Pumps (Vertical Deepwell, Multi-Stage) in accordance with quality ISO:19001 requirements and European Union and Polish Directives and Regulations including the applicable Codes and Standards for the Poland Nuclear Power Plant. The scope of work shall include design and manufacture of CDS Condensate Pumps (Vertical Deepwell, Multi-Stage) that meet specifications, drawings, and other purchase order requirements. Delivery may be performed by either Bechtel or company, as determined by Bechtel. Interested companies must register/update their Company's information in Bechtel's iSupplier portal at https:// www.bechtel.com/supplier/. If Company has any questions or to express interest in bidding on this requirement, Company shall notify Bechtel’s Contact Person. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire where interested party would complete with response to Bechtel for review. Bechtel notes that previous proven capabilities and experience of similar scale and complexity will be mandatory, and additional documentation / evidence may be required. 2. The prequalification criteria shall be included in the prequalification questionnaire, examples thereof include demonstration of (i) experience in furnishing similar condensate pumps equipment type in past or current projects, (ii) availability of equipment/personnel/facilities for performance of scope, (iii) compliance to ISO 9001:2015 or quality program that is comparable to ISO 9001 (to be approved by Bechtel and PEJ), (iv) compliance to certification of legally mandatory requirements, (v) financial standing (solvency), and (vi) verification of organizational capabilities. Shop visits to perform a supplier survey or audit prior to RFQ issuance may be required. 3.Upon Bechtel’s evaluation of your response to the Poland Prequalification Questionnaire, Bechtel will notify if your Company meets, conditionally meets, or does not meet the prequalification requirements that closely match the requirements. Your Company's submission of the Prequalification Questionnaire does not automatically qualify your Company to be a prequalified Company for the Scope. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: -any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or -economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. 4.Each prequalified Company will be required to execute a Non-Disclosure Agreement (NDA). 5.Companies meeting the prequalification criteria and who have executed the NDA will be invited to submit the proposals for CDS Condensate Pumps (Vertical Deepwell, Multi-Stage). 6.The Request for Quotation (RFQ) shall include the proposal questionnaire(s), scope of work, specifications, drawings, datasheets, terms and conditions, award criteria, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. Supplier User Guides: https://www.bechtel.com/supplier/#registration-Info 7.Proposal may be provided in EURO, PLN, and USD. Furthermore, the proposals will be requested as unit pricing per CDS Condensate Pumps. 8.Award will be made to the responsive and responsible company whose proposal meets the requirements of the RFQ and provides a technically acceptable proposal. Consideration of the following key criteria, together with cost, will determine the final decision for award(s), which will be detailed further in the Bid Document(s) and during the RFQ phase. -Technical Capability -Previous Proven Relevant Experience -Quality -Delivery Management -Schedule The evaluation factors to determine the selected proposal shall be based on the commercial factors that impact overall cost, such as freight, proximity to project site, Carbon Border Adjustment Mechanism (CBAM) requirements, payment terms, performance and payment securities, and insurance. Buyer may divide the award among more than one Supplier if this is in the best interest of Buyer. Supplier must specifically list in their proposal all the country(ies) of origin for each major component. All materials must meet the requirements of the applicable codes and specifications of the RFQ. 9.Any Companies that do not meet the legally mandatory compliance requirement will be excluded. 10.The procedure for the Company to gain access to classified information, as required, will be subject to compliance with the executed NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFQ document. 11.The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
Publications Office of the European Union
The Company shall certify that (i) is not subject to Sanctions, and (ii) do not present a threat to the security interests of the Poland, in particular that they are not (a) a Russian national, or a natural or legal person, entity or body established in Russia or (b) a legal person, entity or body whose proprietary rights are directly or indirectly owned for more than fifty percent (50%) by an entity referred to in point (a) of this Section or (c) a natural or legal person, entity or body acting on behalf or at the direction of an entity referred to in point (a) or (b) of this Section. The Company shall confirm that all subcontractors of any tier will provide that they are not subject to any criteria mentioned above as a part of the Proposal. The Company shall also confirm that no Iron and Steel products subject to the EU import ban, including those processed from third party, are used in furnishing the requested product. “Sanctions” shall mean measures aimed at maintaining or restoring international peace and security enacted by the United Nations and/or the European Union and/or the Poland and/or the US, or any such sanctions law applicable to the Company or undertaking relating to or in connection with this submittal of Prequalification Questionnaire or undertaking's, such as sectoral measures, economic and financial measures, or measures introduced against countries (embargoes), natural or legal persons or groups or non-state entities (blocking measures). Any Companies that do not meet the legally mandatory compliance requirements, as specified above, will be excluded.
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The package is anticipated to include nine (9) vertical deepwell, multi-stage centrifugal pumps, arranged as three (3) pumps per unit in a 3 × 50% configuration, complete with drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services. The equipment shall be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. Interested suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project.
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
CDS Condensate Pumps
Other
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The package is anticipated to include nine (9) vertical deepwell, multi-stage centrifugal pumps, arranged as three (3) pumps per unit in a 3 × 50% configuration, complete with drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services. The equipment shall be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. Interested suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project.
Deadline (Pre-qualification Submittal): September 2026 (Forecast – Subject to change) RFQ Document Issuance: November 2026 (Forecast – Subject to change) Supplier Proposals Due: January 2027 (Forecast – Subject to change) Order Award Date: May 2027 (Forecast – Subject to change) * After completion of the design submittals, the company may be placed on hold until release for fabrication. The timing of the release is based on required material acquisition, fabrication and delivery lead times. Required on Site (ROS) Date (Forecast – Subject to change) ROS Dates: Unit 1 – December 2032 Unit 2 – December 2033 Unit 3 – December 2034 Additional delivery schedule information will be provided in the RFQ Package.
https://www.bechtel.com/supplier/#registration-info
84-210
01
Gdańsk
other
Lubiatowo-Kopalino
allowed
eforms-sdk-1.14
4e36c8a8-6eaa-405b-a46c-7058421d4b1b
09:30:45Z
[telefon eliminat]
[telefon eliminat]
E3
LOT-0001
PL634
LU000
8f60d51e-6628-49f7-a650-dae4fce17864
Luxembourg
supplies
https://www.bechtel.com/projects/poland-ap1000-nuclear-power-plant/
2026-08-10Z
https://op.europa.eu
[email eliminat]
cn-standard
ORG-0000
ORG-0001
epo-procurement-document
[telefon eliminat]
PUBL
POL
[email eliminat]
LUX
LocalLegalBasis
2026-08-11+02:00
2.3
Weronika Krawańska
153/2026
ted-esen
2417
ENG
Loturi TED
1
Lot 1
CDS Condensate Pumps
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The package is anticipated to include nine (9) vertical deepwell, multi-stage centrifugal pumps, arranged as three (3) pumps per unit in a 3 × 50% configuration, complete with drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services. The equipment shall be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. Interested suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project.
42900000 — Echipamente industriale
Detalii licitație
Descriere
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The package is anticipated to include nine (9) vertical deepwell, multi-stage centrifugal pumps, arranged as three (3) pumps per unit in a 3 × 50% configuration, complete with drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services. The equipment shall be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. Interested suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project.
Căutări relevante pentru 555854-2026
Legături interne utile pentru CPV, autoritate și expresiile principale din denumirea procedurii.
Deadline (Pre-qualification Submittal): September 2026 (Forecast – Subject to change) RFQ Document Issuance: November 2026 (Forecast – Subject to change) Supplier Proposals Due: January 2027 (Forecast – Subject to change) Order Award Date: May 2027 (Forecast – Subject to change) * After completion of the design submittals, the company may be placed on hold until release for fabrication. The timing of the release is based on required material acquisition, fabrication and delivery lead times. Required on Site (ROS) Date (Forecast – Subject to change) ROS Dates: Unit 1 – December 2032 Unit 2 – December 2033 Unit 3 – December 2034 Additional delivery schedule information will be provided in the RFQ Package.
The Company shall certify that (i) is not subject to Sanctions, and (ii) do not present a threat to the security interests of the Poland, in particular that they are not (a) a Russian national, or a natural or legal person, entity or body established in Russia or (b) a legal person, entity or body whose proprietary rights are directly or indirectly owned for more than fifty percent (50%) by an entity referred to in point (a) of this Section or (c) a natural or legal person, entity or body acting on behalf or at the direction of an entity referred to in point (a) or (b) of this Section. The Company shall confirm that all subcontractors of any tier will provide that they are not subject to any criteria mentioned above as a part of the Proposal. The Company shall also confirm that no Iron and Steel products subject to the EU import ban, including those processed from third party, are used in furnishing the requested product. “Sanctions” shall mean measures aimed at maintaining or restoring international peace and security enacted by the United Nations and/or the European Union and/or the Poland and/or the US, or any such sanctions law applicable to the Company or undertaking relating to or in connection with this submittal of Prequalification Questionnaire or undertaking's, such as sectoral measures, economic and financial measures, or measures introduced against countries (embargoes), natural or legal persons or groups or non-state entities (blocking measures). Any Companies that do not meet the legally mandatory compliance requirements, as specified above, will be excluded.